Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
hoaili

Our 142Sqm Ea @ Sk

Recommended Posts

Looking for good contractors? Click here for your request

Thumbnails sent by my ID via email immediately the next day after our first meeting in early June, though we have not confirm to engage her at that time. :bow:

thumbnailsz.jpg

Uploaded with ImageShack.us

Some conceptual drawings, not the usual 3D drawings provided by Singapore ID. Really like her overall design and ideas.

Due to very very tight budget, we have to forgo some of the ideas :bangwall:

Foyer

foyer.jpg

Uploaded with ImageShack.us

Marble chip flooring at Foyer will look like this

foyerflooring.jpg

Uploaded with ImageShack.us

View from Living to foyer

viewfromlivingtofoyer.jpg

Uploaded with ImageShack.us

Shoe Cabinet

shoecabinets.th.jpg

 

Share this post


Link to post
Share on other sites

Living Area. Decided not to have the raised storage platform and natural stone feature wall due to very very tight budget. Hope end result turns out well without the feature wall.

livingn.jpg

Uploaded with ImageShack.us

Dining Area. A divider with full height mirror facing the dining table and column strips facing the living area. Feature wall to cover the ugly household shelter.

diningk.jpg

Uploaded with ImageShack.us

20120715194126.jpg

Uploaded with ImageShack.us

Kitchen

4kitchen.jpg

Uploaded with ImageShack.us

Sliding door at the entrance to all the bedrooms create privacy. Of course the door is not in this colour :sport-smiley-018:

slidingdoortocorridoor.jpg

Uploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Passage way to the bedrooms. Marble chip flooring and full height mirror at the end of the walk way. Again, due to budget, have to forgo the box columns at the walk way ceiling. :dunno:

corridoor.jpg

Uploaded with ImageShack.us

Daughter's room without the custom made storage bed frame

sroomj.jpg

Uploaded with ImageShack.us

Son's room without the storage cabinet on the right

sroomrevised.jpg

Uploaded with ImageShack.us

MBR - WIW "hiding" behind the bed. No drwaing for WIW :unsure: Will get some nice wall decals to decorate the plain divider.

mbry.jpg

Uploaded with ImageShack.us

Edited by hoaili
 

Share this post


Link to post
Share on other sites

Tiles selection

Living / Bedrooms / Kitchen wall

livingroomtile.jpg

Uploaded with ImageShack.us

Kitchen - top for wall and bottom for floor

kitchentiles.jpg

Uploaded with ImageShack.us

Foyer - marble chips from Malaysia.

marblechipfoyer.jpg

Uploaded with ImageShack.us

Master Toilet - top for wall and bottom for floor. No feature wall for master toilet. ID told me to do something different :idea: - the highlight for the toilet will be the vanity top. No drawing as to keep me suspended.

mbrtoilettiles.jpg

Uploaded with ImageShack.us

Also will be using river stones (also from Malaysia) at the shower area at Master Toilet :bath: ID said can do foot massaging at the same time while having shower :notti:

riverstonembrtoiletshow.jpg

Uploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Finally, the day has come ! After waiting for 120 days since we signed the OTP, tomorrow will be the completion date for our purchase :dancingqueen:

Reno will start immediately on the next day with hacking. Hopefully everything 'soon soon' so I can move in by 24 Oct. Got to vacant my existing place on the same day, as the completion of my selling is on 25 Oct.

 

Share this post


Link to post
Share on other sites

Bought the following items from Hoe Kee :

Blanco Pleon 8 with Mida Sink Mixer (Package)

blancopleon8.jpg

Uploaded with ImageShack.us

ROZ W.C for Master Toilet

mbrtoiletwc.jpg

Uploaded with ImageShack.us

ROZ W.C for Common Toilet

commontoiletwc.jpg

Uploaded with ImageShack.us

Wash Basin for Master Toilet

mbrtoilet.jpg

Uploaded with ImageShack.us

Wash Basin for Common Toilet (without the stand)

commontoilet.jpg

Uploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Finally, the day has come ! After waiting for 120 days since we signed the OTP, tomorrow will be the completion date for our purchase :dancingqueen:

Reno will start immediately on the next day with hacking. Hopefully everything 'soon soon' so I can move in by 24 Oct. Got to vacant my existing place on the same day, as the completion of my selling is on 25 Oct.

Congrats, finally all is going to start.

 

Share this post


Link to post
Share on other sites

Yippe ! Received call from agent, he has collected the keys from the ex-owner :good: I am now the official owner of the resale EA ! Will meet agent at new house later to get the keys and lock up the place ! Reno shall start at 9am sharp tomorrow :yamseng:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×