MamaO 1 Report post Posted August 30, 2012 Master Toilet - really cannot "tahan" the pipes, so dirty !Uploaded with ImageShack.usCommon ToiletUploaded with ImageShack.usService BalconyUploaded with ImageShack.usHousehold Shelter - near the kitchen entranceUploaded with ImageShack.usBalconyUploaded with ImageShack.usThey have put the kitchen sink in the service balcony instead. Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 2, 2012 Thumbnails sent by my ID via email immediately the next day after our first meeting in early June, though we have not confirm to engage her at that time. Uploaded with ImageShack.usSome conceptual drawings, not the usual 3D drawings provided by Singapore ID. Really like her overall design and ideas. Due to very very tight budget, we have to forgo some of the ideas FoyerUploaded with ImageShack.usMarble chip flooring at Foyer will look like thisUploaded with ImageShack.usView from Living to foyerUploaded with ImageShack.usShoe Cabinet Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 2, 2012 Living Area. Decided not to have the raised storage platform and natural stone feature wall due to very very tight budget. Hope end result turns out well without the feature wall.Uploaded with ImageShack.usDining Area. A divider with full height mirror facing the dining table and column strips facing the living area. Feature wall to cover the ugly household shelter.Uploaded with ImageShack.usUploaded with ImageShack.usKitchenUploaded with ImageShack.usSliding door at the entrance to all the bedrooms create privacy. Of course the door is not in this colour Uploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 2, 2012 (edited) Passage way to the bedrooms. Marble chip flooring and full height mirror at the end of the walk way. Again, due to budget, have to forgo the box columns at the walk way ceiling. Uploaded with ImageShack.usDaughter's room without the custom made storage bed frameUploaded with ImageShack.usSon's room without the storage cabinet on the rightUploaded with ImageShack.usMBR - WIW "hiding" behind the bed. No drwaing for WIW Will get some nice wall decals to decorate the plain divider.Uploaded with ImageShack.us Edited September 2, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 2, 2012 Tiles selectionLiving / Bedrooms / Kitchen wallUploaded with ImageShack.usKitchen - top for wall and bottom for floorUploaded with ImageShack.usFoyer - marble chips from Malaysia. Uploaded with ImageShack.usMaster Toilet - top for wall and bottom for floor. No feature wall for master toilet. ID told me to do something different - the highlight for the toilet will be the vanity top. No drawing as to keep me suspended.Uploaded with ImageShack.usAlso will be using river stones (also from Malaysia) at the shower area at Master Toilet ID said can do foot massaging at the same time while having shower Uploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 2, 2012 Common Toilet - wall / feature wall / floorUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 10, 2012 Finally, the day has come ! After waiting for 120 days since we signed the OTP, tomorrow will be the completion date for our purchase Reno will start immediately on the next day with hacking. Hopefully everything 'soon soon' so I can move in by 24 Oct. Got to vacant my existing place on the same day, as the completion of my selling is on 25 Oct. Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 10, 2012 Bought the following items from Hoe Kee :Blanco Pleon 8 with Mida Sink Mixer (Package)Uploaded with ImageShack.usROZ W.C for Master ToiletUploaded with ImageShack.usROZ W.C for Common ToiletUploaded with ImageShack.usWash Basin for Master ToiletUploaded with ImageShack.usWash Basin for Common Toilet (without the stand)Uploaded with ImageShack.us Share this post Link to post Share on other sites
MamaO 1 Report post Posted September 11, 2012 Finally, the day has come ! After waiting for 120 days since we signed the OTP, tomorrow will be the completion date for our purchase Reno will start immediately on the next day with hacking. Hopefully everything 'soon soon' so I can move in by 24 Oct. Got to vacant my existing place on the same day, as the completion of my selling is on 25 Oct.Congrats, finally all is going to start. Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 11, 2012 Congrats, finally all is going to start.Thanks MamaO !Finally collected the keys from ex-owner ! Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 11, 2012 Yippe ! Received call from agent, he has collected the keys from the ex-owner I am now the official owner of the resale EA ! Will meet agent at new house later to get the keys and lock up the place ! Reno shall start at 9am sharp tomorrow Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 11, 2012 Collected key from Agent, and had the door locked up. Uploaded with ImageShack.us"Open Door" ceremony will be between 6 and 7 am tomorrow Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 11, 2012 Hope u have a smooth reno journey.... Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 11, 2012 Hope u have a smooth reno journey....Thanks a lot, Elvin ! Share this post Link to post Share on other sites
May_dream1 14 Report post Posted September 11, 2012 Congrats in getting your dream flat. Now Reno time to make it your dream home! Share this post Link to post Share on other sites