Nivle 0 Report post Posted September 23, 2012 (edited) DAY 41, WEEK 6 COMPLETEDTomorrow chemical wash(1st time).Tuesday start Painting.From WEDNESDAY -Carpentry start coming in.Thursday, Hood and hob installation.follow by:Kitchen cabinet,Island top.Windows grill,Plumber come in and do pipingInstallation of lights and fans...Chemical wash(2nd time)Mission completed...Should be correct Edited September 23, 2012 by Nivle Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 23, 2012 Let's see the progress after 6 weeks..From entranceLiving hall-dinning area-StoreroomLiving Hall-BalconyLittle Walkway-Right side Kitchen,common toilet.Left side, Bedroom 4 n bedroom 5. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 23, 2012 Common toiletKitchen.Bedroom 4 for 3rd princessBedroom 5 for PrinceAir con drainage goes to Balcony Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 23, 2012 MBREntranceFeature wall on the left end.WIWBathroomAir con drainage for 3 air cons(to be box up later) Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 23, 2012 Another little walkwayBedroom 2 for 2nd princessBedroom 3 for 1st princess Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 23, 2012 Before-see under the window, like a big holeAfter patching , think they have done a good job Share this post Link to post Share on other sites
HaiDeChen 0 Report post Posted September 23, 2012 Wow amazing project! Looking forward to seeing completed apartment! Share this post Link to post Share on other sites
May_dream1 14 Report post Posted September 25, 2012 DAY 41, WEEK 6 COMPLETEDTomorrow chemical wash(1st time).Tuesday start Painting.From WEDNESDAY -Carpentry start coming in.Thursday, Hood and hob installation.follow by:Kitchen cabinet,Island top.Windows grill,Plumber come in and do pipingInstallation of lights and fans...Chemical wash(2nd time)Mission completed...Should be correctshould be on time lah.... must remember to have house warming ok? i want to go see Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 29, 2012 should be on time lah.... must remember to have house warming ok? i want to go seehouse warming no problem... gain city voucher preferred Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 29, 2012 Wow amazing project! Looking forward to seeing completed apartment!hi Hai, Thanks for visiting.. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 29, 2012 DAY 47, WEEK 7 completedPainting of whole house completedFrom main doorDinning areaLiving room and blue blue balconyLittle walkwayKitchen Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 29, 2012 Bedroom 2Bedroom 3Bedroom 4Bedroom 5-electrolux n universal stuffs waiting for installation... Share this post Link to post Share on other sites
LLChing 0 Report post Posted October 3, 2012 Completing reno soon? Anymore photos update? Share this post Link to post Share on other sites
Nivle 0 Report post Posted October 4, 2012 quote name='LLChing' timestamp='1349250094' post='749832']Completing reno soon? Anymore photos update? Yes..pending carpentry work as follows:kitchen cabinets up, left backing and top.only 1 wardrobe complete.Pening 3 more wardrobes, 4 study tables cum shelving and MBR WIW..Living room feature wall and shoe cabinet.store room 'magical' glass doorMoving in date postpone for 3 days and all quite comfotable with the arrangement.. Will updates pictures tomorrow morning... Tomorrow will install all lightings and can go up at night already . Share this post Link to post Share on other sites
Nivle 0 Report post Posted October 5, 2012 DAY 50, Week 8 , Day 2Arrival of carpentryFall-in at Lift lobby.2 of the guy carried this piece up to 11th storey cos cannot go in lift Share this post Link to post Share on other sites