Nivle

Dream Home-5 Bedrooms Ea At Kk(Tpe)

Recommended Posts

DAY 41, WEEK 6 COMPLETED

Tomorrow chemical wash(1st time).

Tuesday start Painting.

From WEDNESDAY -Carpentry start coming in.

Thursday, Hood and hob installation.

follow by:

Kitchen cabinet,

Island top.

Windows grill,

Plumber come in and do piping

Installation of lights and fans...

Chemical wash(2nd time)

Mission completed...

Should be correct

Edited by Nivle
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Let's see the progress after 6 weeks..

img1445ax.jpg

From entrance

img1447t.jpg

Living hall-dinning area-Storeroom

img1446tt.jpg

Living Hall-Balcony

img1428bo.jpg

Little Walkway-

Right side Kitchen,common toilet.

Left side, Bedroom 4 n bedroom 5.

 

Share this post


Link to post
Share on other sites

DAY 41, WEEK 6 COMPLETED

Tomorrow chemical wash(1st time).

Tuesday start Painting.

From WEDNESDAY -Carpentry start coming in.

Thursday, Hood and hob installation.

follow by:

Kitchen cabinet,

Island top.

Windows grill,

Plumber come in and do piping

Installation of lights and fans...

Chemical wash(2nd time)

Mission completed...

Should be correct

should be on time lah.... must remember to have house warming ok? i want to go see

 

Share this post


Link to post
Share on other sites

should be on time lah.... must remember to have house warming ok? i want to go see

house warming no problem... :dribble:gain city voucher preferred :dribble:

 

Share this post


Link to post
Share on other sites

DAY 47, WEEK 7 completed

Painting of whole house completed

img1507x.jpg

From main door

img1508se.jpg

Dinning area

img1509bl.jpg

Living room and blue blue balcony

img1510bh.jpg

Little walkway

img1511we.jpg

Kitchen

 

Share this post


Link to post
Share on other sites

quote name='LLChing' timestamp='1349250094' post='749832']

Completing reno soon? Anymore photos update? :dribble:

Yes..

pending carpentry work as follows:

kitchen cabinets up, left backing and top.

only 1 wardrobe complete.Pening 3 more wardrobes, 4 study tables cum shelving and MBR WIW..

Living room feature wall and shoe cabinet.

store room 'magical' glass door

Moving in date postpone for 3 days and all quite comfotable with the arrangement.. :yamseng:

Will updates pictures tomorrow morning... Tomorrow will install all lightings and can go up at night already :sport-smiley-004:

.

 

Share this post


Link to post
Share on other sites

DAY 50, Week 8 , Day 2

img1616qv.jpg

Arrival of carpentry

img1548p.jpg

img1552m.jpg

img1549m.jpg

Fall-in at Lift lobby.

img1553iv.jpg

2 of the guy carried this piece up to 11th storey cos cannot go in lift :jawdrop:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×