MamaO 1 Report post Posted September 4, 2012 Terminator came today. He did the spraying in 1 hour. next week got 1 more inspection. if ok, then will come back with dog3 months later... if no good, then spray again.will upload some pictures of dead termites soon..Hope all will be smooth. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 5, 2012 DAY 21 BeforeTerminator in actionAfterIssue ends here..wait for next week inspection Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 5, 2012 Day 22Living room Floor tiles almost donewalkway to kitchen front floor tiles readywalkway to room floor tiles almost there Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 5, 2012 (edited) DAY 23MBR Bath tub.... can test water soonKitchen turquoise tiles selected by Princesses to go with the rest.Starting to lay floor tiles for room today...starting with bedroom 2 Edited September 5, 2012 by Nivle Share this post Link to post Share on other sites
May_dream1 14 Report post Posted September 5, 2012 Hopefully next week inspection will be ok. Share this post Link to post Share on other sites
Sarah030309 0 Report post Posted September 6, 2012 close up of our living room floor tile:MBR floor tile-yellowish kids floor tiles:Wife says the below dustbin brand rebun is very good, cockroaches cannot come in, etc etc..but after install, Andrew said this is actually the same one he wanted/quote(much cheaper)to install for us? tiok pian liao Hi Can i check with you what brand for the dustbin is it ah? how much did u bought it? Thank you Share this post Link to post Share on other sites
Sarah030309 0 Report post Posted September 6, 2012 Bro, replied you in PM, please check..Can you kindly send me the cost and the size too?Thank you!!! Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 7, 2012 Hi Sarah.. Pm you already. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 7, 2012 Hi Sarah.. Pm you already. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 7, 2012 Hi Sarah.. Pm you already. Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 7, 2012 (edited) Sorry repost cos show me error. Edited September 7, 2012 by Nivle Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 9, 2012 DAY 27SUMMARY AFTER 4 WEEKS OF RENOPiping up n ready for MBR n common toilet.Pending-construct hollow blocks and do internal storage/concave(not sure what is the exactly correct term), to put shampoo,bath gel.mainly becos steel type will get rusty.The very important tap for my balcony aquariums..... Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 9, 2012 5 BEDROOMS FLOORINGS ALL DONEMBR1st Princess room2nd Princess room(eariest to complete, so they putting their things inside)3rd Princess roomPrince room Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 9, 2012 Prince wanted this for his ceiling light... Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 9, 2012 Dinning light under consideration... Share this post Link to post Share on other sites