JJWOOF 0 Report post Posted September 19, 2012 Nope doesn't affect the kitchen cabinet.I think i paid about 400 plus including the tiles to do this cement wall. Actually the tiles only need to cover the inner side but the tiler also cover the outer side which actually will be covered by the carpentry.Thanks for the info. I think the tiler is right considering if want to prevent wood from damage if water leakage. From the pic, the tiler did left, right, inner side wall, with tiles. The closing cabinet door remains as wood. Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 19, 2012 (edited) Wah! Too expensive for me... Sad.Btw, is it water resistant?Yes it's water resistant...the cost depends on your door size...for mine the size is bigger than usual cause it's cater for handicap..i guess for your flat @holland it's older flats the door size is smaller...as compared to wooden lourve door the pricing is at least lower...as it's swing slide so will not "eat" up my toliet space...but you need to have shower screen for this type of door cause the water will splash out... Edited September 19, 2012 by crypaz Share this post Link to post Share on other sites
Nexer 1 Report post Posted September 19, 2012 Yes it's water resistant...the cost depends on your door size...for mine the size is bigger than usual cause it's cater for handicap..i guess for your flat @holland it's older flats the door size is smaller...as compared to wooden lourve door the pricing is at least lower...as it's swing slide so will not "eat" up my toliet space...but you need to have shower screen for this type of door cause the water will splash out...Thks for the info!Yup, i will be installing shower curtain to prevent water from splashing out. Share this post Link to post Share on other sites
and888 1 Report post Posted September 19, 2012 Thanks for the info. I think the tiler is right considering if want to prevent wood from damage if water leakage. From the pic, the tiler did left, right, inner side wall, with tiles. The closing cabinet door remains as wood.Mine quote 500+>.. Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 19, 2012 (edited) Mine quote 500+>..I got quoted $800 before by other firms... Edited September 19, 2012 by crypaz Share this post Link to post Share on other sites
and888 1 Report post Posted September 19, 2012 I got quoted $800 before by other firms...Think this little structure is worth the investment in events of leaks... Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 19, 2012 Think this little structure is worth the investment in events of leaks...Agree. Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 19, 2012 Common Room 1Common Room 2Living RoomMy Key Door Stopper Share this post Link to post Share on other sites
JJWOOF 0 Report post Posted September 19, 2012 I got quoted $800 before by other firms...wow, this is a lot! I see what my contractor quote me and update all. Share this post Link to post Share on other sites
asamgelugor 0 Report post Posted September 19, 2012 Hi crypaz,did you paint your bedroom doors white? Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 19, 2012 Hi crypaz,did you paint your bedroom doors white?Yes it's white... Share this post Link to post Share on other sites
asamgelugor 0 Report post Posted September 20, 2012 HI crypaz,thats great, can you PM me your contractor contact becos my contractor for some reason refuse to paint my bedroom doors white, he got all kinds of reason for not doing it. I intend to paint my doors white after my reno is done, so its a small job. thanks! Yes it's white... Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 20, 2012 HI crypaz,thats great, can you PM me your contractor contact becos my contractor for some reason refuse to paint my bedroom doors white, he got all kinds of reason for not doing it. I intend to paint my doors white after my reno is done, so its a small job. thanks!My doors i got them from ****, so it's actually the workers from **** that paint my door white...not my contractor.... Share this post Link to post Share on other sites
asamgelugor 0 Report post Posted September 20, 2012 My doors i got them from ****, so it's actually the workers from **** that paint my door white...not my contractor....Haha ok. thanks anyway! Share this post Link to post Share on other sites
crypaz 1 Report post Posted September 22, 2012 (edited) Carpentry uncle came up to do additional shelving for the kitchen bottom cabinet, done up the MBR mirror, and install the top shelf for the kitchen cabinetMop and broom holder. Makes the place neater.Painting touch up is done. Suppose to paint door frame but due to time constraint it was push to next sat. Installation of tap is done. Gas supply is ready. Chemical washing is only half done....:-(Furniture will come in next sat. Edited September 22, 2012 by crypaz Share this post Link to post Share on other sites