ladygeorgette 0 Report post Posted January 8, 2013 22 Nov 2012 - Day 9Nothing much is done except that the new casement windows are up (pics taken from hubs phone). Pardon the dark photos as electricity is not up yet. Share this post Link to post Share on other sites
ladygeorgette 0 Report post Posted January 9, 2013 (edited) 1 Dec 2012 - Day 19Tiling works were completed when I visited the unit on 1 Dec. Feels rather slow on my end. Common bathroomKitchen wallsMBR shower area Edited February 16, 2013 by ladygeorgette Share this post Link to post Share on other sites
Z3phy 2 Report post Posted January 10, 2013 Hi ladygeorgettei also wanna do vinyl tiles as my flooring for the bedrooms. Any advice from your ID? Share this post Link to post Share on other sites
Xperos 0 Report post Posted January 21, 2013 Hey there, I'm also taking keys soon in March and also had the exactly same floor area as you and including the bought access area. Looking forward to see pictures of your renovations.Same here, mine is also 27years and super need to be hack down, and the pity it is a prefab cause I was thinking to conceal some of the wiring. Share this post Link to post Share on other sites
giselleL 0 Report post Posted February 2, 2013 (edited) ooh your house layout quite similar to mine! we bought 2.5yrs ago but didnt do much reno.. now reading this forum making me so gien to do some minor reno Clarviboi, we have the same floor plan too! The MBR & BR 2 are of the same size! We are renovating after CNY, looking forward to it! Edited February 2, 2013 by giselleL Share this post Link to post Share on other sites