Dear Sir,

I am about to renovate my 4 room in ponggol .I wanted a comfortable place. I am quite comfortable with ID designer. Now my ID have give me a quote. But I am not sure it is too expensive.

Based On

WET WORKS

LIVING / DINING ROOM

Supply Labour & Materials To Lay 600mm x 600mm Homogeneous Floor Tiles 436 sqft 3,270.00

> Selection of Tiles: Up to $3.50 psf

> Includes: Skirting using Cut Tiles

3x BEDROOMS

Supply Labour & Materials To Lay 800mm x 800mm Homogeneous Floor Tiles 524 sqft 3,930.00

> Selection of Tiles: Up to $3.50 psf

> Includes: Skirting using Cut Tiles

KITCHEN / YARD

Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets 1 unit 180.00

Construct Tiled Cement Base for Refrigerator 1 unit 100.00

Construct Tiled Cement Base for Washing Machine 1 unit 100.00

COMMON TOILET

Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00

> Selection of Tiles: Up to $2.50 psf

> Excludes: Border/Special Tiles

Construct Tiled Cement Shower Kerb 1 area 150.00

MASTER TOILET

Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00

> Selection of Tiles: Up to $2.50 psf

> Excludes: Border/Special Tiles

Construct Tiled Cement Shower Kerb 1 area 150.00

CEILING WORKS

Construct False Ceiling/Light Boxes/ Light Holders **** Room, Dinning Room & Passage Way Area

3 areas 1,200.00

Construct False Ceiling/Light Boxes/ Light Holders At Master Bedroom Area

1 area 950.00

Construct Curtain Pelmet **** Room (Window Areas) 1 unit 150.00

Construct Curtain Pelmet At Master Bedroom (Window Areas) 1 unit 150.00

CARPENTRY WORKS

NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation.

BOMB SHELTHER (STORE ROOM)

Supply Labour & Materials To Install Designed Feature Door c/w Tea Mirror Finishing As Per Design Proposed

8 feet 2,360.00

LIVING ROOM

Supply Labour & Materials To Install Designed Feature Wall c/w Laminate & Tea Mirror Finishing As Per Design Proposed

9 feet 2,250.00

Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 8 feet 960.00

KITCHEN

Supply Labour & Materials To Install Built-In Kitchen Cabinets - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 39 ft run 4,290.00

> Includes: Choice from FULL RANGE of LAMITAK 2008/09 Laminates (Latest) (Excludes: Metallic Laminates)

> Includes: Selected Designer Handles/Knobs

> Includes: 1 Pc Aluminium-Framed Frosted Glass Door

> Includes: 1 Set Drip-Dry Dish Rack

Supply Labour & Materials To Install Built-In Tall Unit Kitchen Cabinet - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 2 feet 540.00

Supply Labour & Materials To Install Granite Surface Top 17 ft run 1,870.00

> Includes: Standard Back-Splash & Front-Edge Profiling

Add-On: Undermounting of Kitchen Sink 1 unit 80.00

MASTER BEDROOM

Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 12 feet 3,240.00

Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 5 feet 600.00

Supply Labour & Materials To Install Designed Full-Height Feature Wall Cum Bed-Head c/w Imported Fabric Or PVC Cushion Finishing As Per Design Proposed 9 feet 2,655.00

Supply Labour & Materials To Install Bedside Table 2 units 500.00

BEDROOM 2

Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00

BEDROOM 3

Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00

MASTER TOILET

Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets, Full-Length Mirror & Top Cabinets w/ Light Pelmet (Excludes: Light Fittings) 4 feet 720.00

Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00

COMMON TOILET

Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets

4 feet 560.00

Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00

LAMINATE FLOORING

Supply Labour & Materials To Install BERRY Laminate Flooring At Master Bedroom As Per Design Proposed (Includes: Skirting) 91 sqft 720.00

Construct Raised 6 inch Platform w/ Timber Structure At Master Bedroom (Subject to Min. 100 sq feet)

91 sqft 720.00

GLASS WORKS

Supply Labour & Materials To Install SandBlast Tempered Glass Swing Door (10mm) At Kitchen Entrance

1 unit 850.00

Supply Labour & Materials To Install SandBlast Tempered Glass Backing At Kitchen Wall Area

1 unit 650.00

DOORS, SCREENS & WINDOWS

ROOM DOORS / PD DOORS

Supply Labour & Materials To Install Venner Door C/w Lock Set For 3x Bedrooms & 2x Toilet Entrance Areas

5 nos. 1,500.00

SHOWER SCREENS

Supply Labour & Materials To Install Frameless Tempered Glass Sliding Shower Screen (Includes: Tower/Hand-Rail) At Common Toilet Area 1 unit 850.00

Supply Labour & Materials To Install Frameless Tempered Glass Shower Screen (Includes: Tower/Hand-Rail) At Master Toilet Area 1 unit 580.00

WINDOWS / GRILLS

Supply Labour & Materials To Install Aluminium Sliding Windows Grills (Powder-Coated) **** Room, 3x Bedrooms, Kitchen Yard Window & Grills 4 areas 2,500.00

PLUMBING WORKS

Labour to Install Shower Mixer & Shower Set 2 nos. 140.00

Labour to Install Toilet Wash Basin & Mixer 2 nos. 240.00

Labour to Install Bathroom Accessories (5 pcs) 2 nos. 160.00

Labour to Install Central Water Heater 1 nos. 150.00

Labour to Install Kitchen Sink & Mixer 1 nos. 120.00

PAINTING WORKS

Painting Works for Whole House 1 area 1,200.00

> FULL RANGE of Paints from DULUX/NIPPON

> Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment.

OTHER WORKS

Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) 1 area 300.00

Washing of Whole House (General Cleaning) 1 area 250.00

Haulage of New & Raw Materials 1 area 300.00

Clearing of Debris 1 area 300.00

Thank you fellow renotalk member . Care to comment

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×