sho90 0 Report post Posted July 11, 2012 Dear all,need advise on roughly how much to spend on a whole house renovation works for 121sqm 5 room flat?and any reliable n good workmanship carpentry contracter to recommed? Share this post Link to post Share on other sites
brobear 0 Report post Posted July 17, 2012 Hi sho90 actually ur question is very general cos also need to know what u going to do, can really range. Cos my 4 room i did about 30k while my friend 5 room only 20k. If u need help then pm me Share this post Link to post Share on other sites
yuy 0 Report post Posted August 8, 2012 (edited) I suppose that depends on what u do?in generally, I tink a basic $30k reno will cost something like this:tiling the floors & hacking - $8kkitchen cabinet - $4keach toilet - 3k x 2aircon - $4kwiring - $4kwindow/gates grills - $3kbedroom & toilets door - $1kWhat do u think? Edited August 8, 2012 by yuy Share this post Link to post Share on other sites
renohome 0 Report post Posted August 15, 2012 I suppose that depends on what u do?in generally, I tink a basic $30k reno will cost something like this:tiling the floors & hacking - $8kkitchen cabinet - $4keach toilet - 3k x 2aircon - $4kwiring - $4kwindow/gates grills - $3kbedroom & toilets door - $1kWhat do u think?Hi yuy,Is your breakdown applicable to 5rm resale flats? Is that contractor's pricing? Share this post Link to post Share on other sites
yuy 0 Report post Posted August 16, 2012 Hi yuy,Is your breakdown applicable to 5rm resale flats? Is that contractor's pricing?eh, my breakdown is not a contractor pricing. I am basing on the rough $ tat a typical reno will cost after reviewing the quotation of forumers. Share this post Link to post Share on other sites
Yoyonys 0 Report post Posted August 19, 2012 Dear fren, resale house can be very high or low. ranging from $ 25 - 45K. Share this post Link to post Share on other sites
renomate 0 Report post Posted November 30, 2012 We used artrend for our renovation works.Indeed quite terrible.Poor coordination between carpenter and IDBoss (Kelvin) only interested in moneyOnce we paid up, everything was slowed down to a near haltDelayed project by monthsWorkmanship shoddy and needed revisions which the ID was extremely reluctant to provide.If you do use them, must read their contract which is behind the quotation and in very faint grey ink - Missed it completely because ID did not explain terms of contract to us and we did not sign on the contract side but on the quote side. We didn't even know there was a contract until we were told we needed to pay 95% of the project fees before they installed any carpentry?!! Share this post Link to post Share on other sites