HongWeizhong 0 Report post Posted July 11, 2012 Hi Guys,I am looking at a brochure by OrangeCube from Expo fair.Details are as follows:New HDB Appt (Premium)= $8,388 *price subjected to prevailing GST rateProfessional Services01 Design Construction & Space Planning02 Design Concepts and Proposal & Perspective Drawings03 Materials and Colours Selection04 Consultation on Lighting, Furnishings and Accessories05 Project Management & Site SupervisionMasonry & Flooring Works06 Supply & construct cement mortar base for kitchen cabinet c/w side tiling07 Supply & construct cement mortar base for fridge c/w tiling08 Supply & construct cement mortar base for washing machine c/w tilingCeiling & Paining Works09 Supply & install L-box or false ceiling **** area10 Supply & install L-box or false ceiling at Dining area11 Supply & install flat false ceiling at bedroom passageway12 Supply labour & material to paint whole unit (walls and ceiling) with ICI emulsion paintPlumbing Works13 Supply and extend stainless steel piping for kitchen14 Supply and lay outlet piping for washing machine15 Supply and lay outlet piping for kitchen sink16 Supply labour to install two instant water heaters (or one storage heater)17 Supply labour to install two sets of bathroom accessories18 Supply labour to install kitchen sink and tapMisc Works19 Protection of flooring with corrugated cardboard for living and dining areas and all bedrooms20 Chemical wash for whole unit21 General cleaning upon completion of Works22 Transportation of building materials to and from unit*Haulage & Debris fees by owner where applicablePromotion(A) Design, fabricate & install (L) 20 ft kitchen cabinets in laminate finish c/w ABS trimming(B) Supply and install (L) 10 ft solid Quartz worktop© 1 no. of chrome dish rack(D) 1 no. of aluminium framed frosted glass door(E) 1 no. of cutlery tray(F) 3 sets of anti-slam system for kitchen drawers(G) Supply labour to install cooker hood & hobAll the above for $8388 ++ ..What do you guys think?? Share this post Link to post Share on other sites
casa 0 Report post Posted July 11, 2012 Beware of hidden cost just to be frank Is your's a 3rm or 4rm??based on the quote? Share this post Link to post Share on other sites
HongWeizhong 0 Report post Posted July 11, 2012 Beware of hidden cost just to be frank Is your's a 3rm or 4rm??based on the quote?4 rm flat..Good deal? Share this post Link to post Share on other sites
Batman 0 Report post Posted July 11, 2012 Yeah beware of "hidden costs"... From what I see, there are a lot of "supply labour......."How about the tools? Scarly they say u need to top up $50 per item for the use of "tools", then jia lat liaoJust my point of view lar... better be safe than sorry.Good luck bro Share this post Link to post Share on other sites
Rudra 0 Report post Posted July 11, 2012 Hi Guys,I am looking at a brochure by OrangeCube from Expo fair.Details are as follows:New HDB Appt (Premium)= $8,388 *price subjected to prevailing GST rateProfessional Services01 Design Construction & Space Planning02 Design Concepts and Proposal & Perspective Drawings03 Materials and Colours Selection04 Consultation on Lighting, Furnishings and Accessories05 Project Management & Site SupervisionAbove I am sure you are able to do a better work than these guys. Just based on available pictures on the Internet and your ideas you will be able to concept your own house better. It's not like they are going to wprovide you with a brand new concept or design which no one has. It basically going to be a normal or same used design and concept which others are also taking up this conceptMasonry & Flooring Works06 Supply & construct cement mortar base for kitchen cabinet c/w side tiling 07 Supply & construct cement mortar base for fridge c/w tiling 08 Supply & construct cement mortar base for washing machine c/w tiling the tiles provided sames has your current type/colour?Ceiling & Paining Works09 Supply & install L-box or false ceiling **** area10 Supply & install L-box or false ceiling at Dining area11 Supply & install flat false ceiling at bedroom passageway12 Supply labour & material to paint whole unit (walls and ceiling) with ICI emulsion paint how many colours? the whole quote has no electrical work mention, they can install the false ceiling or L box. But before that your electrical work has to be done. That's one thing they would up sell you when the quote is confirmed. And you might not have price fighting power Plumbing Works13 Supply and extend stainless steel piping for kitchen14 Supply and lay outlet piping for washing machine if yours is new, BTO flat, the above is not needed 15 Supply and lay outlet piping for kitchen sink you will have to get the sink, another item to up sell 16 Supply labour to install two instant water heaters (or one storage heater) 17 Supply labour to install two sets of bathroom accessories18 Supply labour to install kitchen sink and tap the above all are supplying labour only, note that well Misc Works19 Protection of flooring with corrugated cardboard for living and dining areas and all bedrooms20 Chemical wash for whole unit21 General cleaning upon completion of Works22 Transportation of building materials to and from unit*Haulage & Debris fees by owner where applicablePromotion(A) Design, fabricate & install (L) 20 ft kitchen cabinets in laminate finish c/w ABS trimming(B) Supply and install (L) 10 ft solid Quartz worktop© 1 no. of chrome dish rack(D) 1 no. of aluminium framed frosted glass door(E) 1 no. of cutlery tray(F) 3 sets of anti-slam system for kitchen drawers(G) Supply labour to install cooker hood & hob the anti slam system only for the drawers? How about all the other cabinet doors? And also for the aluminium frame glass door? You have many other items like sink, tap Lighting fixtures and other items to buy. Keep in mind.If you need a more comprehensive quote PM me.All the above for $8388 ++ ..What do you guys think?? Share this post Link to post Share on other sites
HongWeizhong 0 Report post Posted July 11, 2012 Many thanks for the feedback.Yeah.. I am thinking they will try to up sell me via many other ways..This is because when I talk to them regarding the details..The quote I get is about 30k as well excluding electrical points.. Share this post Link to post Share on other sites
javer 0 Report post Posted July 12, 2012 Many thanks for the feedback.Yeah.. I am thinking they will try to up sell me via many other ways..This is because when I talk to them regarding the details..The quote I get is about 30k as well excluding electrical points..better to get more quotes and speak with more IDs.. many like to leave some white spaces and eventually when you sign, everything starts surfacing with monetary resolutions. end up you pay more than what you need and soon to realise, you didnt get the best deal after all... Share this post Link to post Share on other sites
jbooncho 0 Report post Posted July 21, 2012 Dear all, be aware of this contractor called Marvin Wong and Shirley Lee from Millennium Lifestyle Pte Ltd. Pay them 80% and they stopped work at around 15%. Pressing us to pay further and was told will not start work until we pay . Currently seeking legal action against them. Pointless to seek Case and police. Police reports were made. They having a booth on this coming renovation fair at Expo, Classic Living 2012 (21/07/12-29/07/12). Please do not engage them.Anyone happened that engage this guy, please let me know. Appreciated that.Marvin Wong/ Shirley LeeMillennium Lifestyle Pte Ltd Share this post Link to post Share on other sites