Saly 0 Report post Posted July 4, 2012 We were the 3rd owner of the 4a room flat in Jurong West St 71. Back then we had not much of moolah to do what others did for their house and we don't like to have any loans either. Therefore, we have been putting up with hairline cracks forming in the kitchen and toilet wall tiles, stained kitchen flooring. No cornices in the bedrooms, the ancient greek pillars in living room, roundish faux ceiling in kitchen entrance and many other flaws.. After a deep thought and some cash we decided to do some facelifts to our tired homme... Share this post Link to post Share on other sites
Saly 0 Report post Posted July 4, 2012 Floorplan:Living Share this post Link to post Share on other sites
Saly 0 Report post Posted July 4, 2012 Kitchen:Our 3 yrs old cabinetno space to place our appliancesMBR Share this post Link to post Share on other sites
Saly 0 Report post Posted July 5, 2012 Things NEED to be done:Kitchen works-Solid work top for kitchen cabinetRepair tiles at sink areaHack wall tiles and retilingOverlay of floor tilesPiping & plumbingToilets-Hack wall tiles and retilingOverlay of floor tilesPiping n plumbingShower curb n screen at MBTVanity cupboard with solid surface at MBTAccessories & sanitariesLiving room-L-box with cove lightingsLaminate flooringBedrooms-L-box with cove lightings for MBRSimple cornices for common roomsLaminate flooringBuild in wardrobe for MBRRewiring n painting for whole houseEstimated damage: $25kWe had selected the tiles for our toilets:and for our kitchen as well:It took us 4hrs to choose the tiles as we have a budget constraint... Share this post Link to post Share on other sites
casa 0 Report post Posted July 5, 2012 can't wait to c your reno pics soonHappy reno Share this post Link to post Share on other sites
san20sg 1 Report post Posted January 13, 2014 any updates? Share this post Link to post Share on other sites