BreadPigZ 0 Report post Posted June 12, 2012 need some advises on the feasibility of this quotation, as I am not too sure of the market rate.1) 10A lighting point x18 = $6302) 13A single point x1 = $553) 13A Double point x5 = $3254) Dimmer switch x1 = $355) Installation of light x25 = $2506) Installation of fan x1 = $457) Shifting of existing switch x1 = $208) Shifting of SCV point x2 = $1609) Shifting of existing phone point x2 = $7010) Shifting of existing power point x6 = $24011) change single to double point x2 = $80Total damage: $1990 thanks alot. Share this post Link to post Share on other sites
othello 0 Report post Posted June 25, 2012 need some advises on the feasibility of this quotation, as I am not too sure of the market rate.1) 10A lighting point x18 = $630 $22) 13A single point x1 = $55 $2.503) 13A Double point x5 = $325 $54) Dimmer switch x1 = $35 $165) Installation of light x25 = $2506) Installation of fan x1 = $457) Shifting of existing switch x1 = $208) Shifting of SCV point x2 = $1609) Shifting of existing phone point x2 = $7010) Shifting of existing power point x6 = $24011) change single to double point x2 = $80Total damage: $1990 thanks alot.labour kinda of expensive I think. CP in red, so you just agar agar their total labour costs. If done individually, maybe the high labour charge is ok, but bundled together, I think it's very expensive !!!Or you just ask them quote labour for 2/3 days work while you provide all the raw materials ?? I also dun know the market rate, cos mine is 'contractor' rate Share this post Link to post Share on other sites