Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts

Electrician to check

I also take noted this important piece of information. Thanks :yamseng:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Last week, there was a rain, some dampness were observed at the interface between rainwater downpipe and the existing gutter, so contractor quickly rectify. There was a heavy downpour again this afternoon, deliberately went down to site to check the rainwater pipe again as well as other roof + ceiling areas, to make sure there are no signs of leakage, thank goodness, so far no water seepage sign.

Good to check on your house during a heavy rain.

Also personally climb up above the false ceiling to observe, all dry, good. It is important if you have high ceiling, to allow for an access panel (600 x 600) for inspection purpose, otherwise, next time got to cut false ceiling and re-patch back. With an access panel, the false ceiling contractr will install additional aluminium support and do a standard cut-out panel design to easy push up and open, and can put back easily. No damage to ceiling.

journeyphoto671.jpg

When access panel in close position

journeyphoto630.jpg

Edited by jumbopanther
 

Share this post


Link to post
Share on other sites

Preparing the walls for painting. Scrap off and remove all existing poor paint works, can see the rough surface on the uneven cemented wall

journey090.jpg

For internal walls, do 'putty' to smoothen all the internal walls to prepare for better paint job later(putty walls not for external walls due to not for exposure to rain). A side view to show the 'smoothen' wall

journeyphoto615.jpg

For external walls and columns, do cement plastering with smooth finish (ok to expose to weather)

journeyphoto692.jpg

 

Share this post


Link to post
Share on other sites

Wah Jumbo Brother what kind of timeline you give ourself for the transformation? :rolleyes:

6 months including authority inspection. Mine is A&A, not just renovation. So, quite massive lot of works. Anyway, not in hurry to move in.

 

Share this post


Link to post
Share on other sites

6 months including authority inspection. Mine is A&A, not just renovation. So, quite massive lot of works. Anyway, not in hurry to move in.

Oh ya...forgot yours is an A&A where you need to PE to come in and BCA approval... :bangwall:

 

Share this post


Link to post
Share on other sites

My extended wall abutting the wall of the neighbour, a 'flashing' installed covering the gap between these 2 walls, so that rainwater will not seep in between the 2 walls but flow to the lower side for proper drainage.

My main contractor is quite proper, does not compromise in quality, ensuring all detailed works are done properly and no short-cuts.

journeyphoto677.jpg

 

Share this post


Link to post
Share on other sites

My extended wall abutting the wall of the neighbour, a 'flashing' installed covering the gap between these 2 walls, so that rainwater will not seep in between the 2 walls but flow to the lower side for proper drainage.

My main contractor is quite proper, does not compromise in quality, ensuring all detailed works are done properly and no short-cuts.

journeyphoto677.jpg

Hi jumbopanther,

Finally gotten my keys. Can pm me your contacts for electrician and plumber? Thanks in advance. :)

 

Share this post


Link to post
Share on other sites

Casting of slab for wet kitchen. For the wet kitchen top, with large openings for sink as well as cooking hob, the 2 'bridges' front and back across the slabs are quite thin, approximately 50mm width. So to make it strong and more robust, the contractor proposed and added steel bars within the thin ends and cast the concrete around it. Now it is so strong that one can stand onto it and not break.

journeyphoto530.jpg

 

Share this post


Link to post
Share on other sites

For my site, this current phase sequence of works:

install equipment inside false ceiling, eg heater > install false ceiling > electrical contractor open holes in false for lighting position > painter do primer/sealer paint 1st coat for all walls and ceiling > installing floor tiles > final 2 coats of finish paint for all walls and ceiling > install light and fan.

Joven horizontal heater (trusted brand)at Level 2 -sharing bewteen common and master toilet.

journeyphoto689.jpg

Another Joven heater at Level 1 toilet, already concealed within the false ceiling, with a 600 x 600 access panel below it for repair or replacement in future.

journeyphoto625.jpg

 

Share this post


Link to post
Share on other sites

Hi onion I pm u the carpenter contact already

Got it thanks!! Still sourcing a builder to do my structure works ><

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×