yokechye 2 Report post Posted July 28, 2012 skirtings are up... 99% completed for floor tiles.Went to collect our Rinnai hob, Fujioh Hood, and Bennington C600 heater from Jerome. Wanted to get the Bosch HBA23B550J oven from him as well but it was sold out. So got it from MDS instead. same price.Waited at new place for the delivery Share this post Link to post Share on other sites
brandonlky 0 Report post Posted July 28, 2012 Progress looking goooood. Congrats Share this post Link to post Share on other sites
yokechye 2 Report post Posted July 28, 2012 Progress looking goooood. Congrats Thank you! More photos coming soon. Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 1, 2012 (edited) Shower kerb done. now waiting for the glass door and screen to be installed.Entrance tiles also done. made it a drop instead of a ramp to prevent dust from flying into our unit.kitchen kerb half way done. only for kitchen cabinets. no fridge and washing machine kerb for us Edited August 1, 2012 by yokechye Share this post Link to post Share on other sites
casa 0 Report post Posted August 1, 2012 Wow reno progress looks goodPls post more pics to shared Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 Wow reno progress looks goodPls post more pics to shared thks! more pics to come! Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 The kitchen plint was completed 2 days ago. Due to some minor height differences after using the level from kitchen and when it reaches the toilet, we decided to do a small kerb. this also prevents water from splashing into the corridor too much during washing. this is how it looks when door close. Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 study room wall with a hole for our HDMI and Cat5 cable thru to living roomView from living roomHDMI cable for now. going to bring my Cat5 cable. It is created to connect my PC to the receiver and wired internet for desktop Share this post Link to post Share on other sites
PinkPluck 0 Report post Posted August 4, 2012 Love how ur mrb toilet door is at the corridor beside entrance of the room. Mine will be such that our bed is directly outside the mrb toilet door. -.-lll happy reno n hope to see more pics! Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 Love how ur mrb toilet door is at the corridor beside entrance of the room. Mine will be such that our bed is directly outside the mrb toilet door. -.-lll happy reno n hope to see more pics! couldn't agree more. mrb toilet door best to be along the corridor so when sleeping wont see the toilet when I turn my head over. Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 The kitchen and study room cabinets arrived when I reached this morning. whole lobby is filled with out stuffs!study room bookshelves waiting to be assembled.This would be where my oven goes. aircon guy also here liao!so packed, our aircon guy have to also moved the cabinets around for them to install the aircon Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 The carpenter's screws box. cool The greatest enjoyment is to see our home coming to live.seeing them work is an enjoymentTop cabinet up! trying to get it level due to not levelled either ceiling or wall Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 aircon guy at work. Noisy!All the thick thick insulationwaiting to be installedAircon up! testing to check for any problems. so far so good! Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 Sink side cabinet almost done.Oven and stove side cannot do cos Citygas only coming on Monday. Our Kraus sink sitting nicely. ok... hope there's enough space for the tap presenting our movable kitchen cabinet. this is going to be placed infront of the HS door in the kitchen to give us longer counter top space to work on. Double up as an island for food serving at dining room during gatherings. Share this post Link to post Share on other sites
yokechye 2 Report post Posted August 4, 2012 Before inserting our "island"In place However, notice that the height difference. May have forgotten to take the kitchen concrete plint height during the fabrication. Informed my contractor and he say he will look into it Share this post Link to post Share on other sites