Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
yokechye

Our First Home Sweet Home

Recommended Posts

skirtings are up... 99% completed for floor tiles.

p1020925z.jpg

Went to collect our Rinnai hob, Fujioh Hood, and Bennington C600 heater from Jerome.

p1020921e.jpg

Wanted to get the Bosch HBA23B550J oven from him as well but it was sold out. So got it from MDS instead. same price.

Waited at new place for the delivery

p1020924i.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Shower kerb done. now waiting for the glass door and screen to be installed.

img201207311836371.jpg

Entrance tiles also done. made it a drop instead of a ramp to prevent dust from flying into our unit.

img201208011843331.jpg

kitchen kerb half way done. only for kitchen cabinets. no fridge and washing machine kerb for us :sport-smiley-018:

img201208011849151.jpg

Edited by yokechye
 

Share this post


Link to post
Share on other sites

The kitchen plint was completed 2 days ago. :sport-smiley-004:

p1020927r.jpg

Due to some minor height differences after using the level from kitchen and when it reaches the toilet, we decided to do a small kerb. this also prevents water from splashing into the corridor too much during washing.

p1020928z.jpg

this is how it looks when door close.

p1020929e.jpg

 

Share this post


Link to post
Share on other sites

study room wall with a hole for our HDMI and Cat5 cable thru to living room

p1020930wr.jpg

View from living room

p1020931x.jpg

HDMI cable for now. going to bring my Cat5 cable. It is created to connect my PC to the receiver and wired internet for desktop :sport-smiley-004:

p1020955xx.jpg

 

Share this post


Link to post
Share on other sites

Love how ur mrb toilet door is at the corridor beside entrance of the room. Mine will be such that our bed is directly outside the mrb toilet door. -.-lll happy reno n hope to see more pics!

 

Share this post


Link to post
Share on other sites

Love how ur mrb toilet door is at the corridor beside entrance of the room. Mine will be such that our bed is directly outside the mrb toilet door. -.-lll happy reno n hope to see more pics!

:good: couldn't agree more. mrb toilet door best to be along the corridor so when sleeping wont see the toilet when I turn my head over. :rofl:

 

Share this post


Link to post
Share on other sites

The kitchen and study room cabinets arrived when I reached this morning. whole lobby is filled with out stuffs!

p1020933nw.jpg

study room bookshelves waiting to be assembled.

p1020936m.jpg

This would be where my oven goes. aircon guy also here liao!

p1020939w.jpg

so packed, our aircon guy have to also moved the cabinets around for them to install the aircon

p1020940r.jpg

 

Share this post


Link to post
Share on other sites

The carpenter's screws box. cool :sport-smiley-018:

p1020941u.jpg

The greatest enjoyment is to see our home coming to live.

p1020942t.jpg

seeing them work is an enjoyment

p1020944n.jpg

Top cabinet up! trying to get it level due to not levelled either ceiling or wall

p1020946ze.jpg

 

Share this post


Link to post
Share on other sites

aircon guy at work. Noisy!

p1020943d.jpg

All the thick thick insulation

p1020935j.jpg

waiting to be installed

p1020938e.jpg

Aircon up! testing to check for any problems. so far so good!

p1020950i.jpg

 

Share this post


Link to post
Share on other sites

Sink side cabinet almost done.p1020952v.jpg

Oven and stove side cannot do cos Citygas only coming on Monday.

p1020953s.jpg

Our Kraus sink sitting nicely. ok... hope there's enough space for the tap :unsure:

p1020956qz.jpg

presenting our movable kitchen cabinet. :dancingqueen: this is going to be placed infront of the HS door in the kitchen to give us longer counter top space to work on. Double up as an island for food serving at dining room during gatherings.

p1020951vb.jpg

 

Share this post


Link to post
Share on other sites

Before inserting our "island"

p1020958e.jpg

In place :sport-smiley-004:

p1020960v.jpg

However, notice that the height difference. May have forgotten to take the kitchen concrete plint height during the fabrication. :bangwall: Informed my contractor and he say he will look into it

p1020961y.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×