hahaha, now my 'dog' stationed permanently in the balcony.

your seller bought it? but i thought resale transaction showed only 147sqm? gotta double check as recently it happened to my friend. Was told that seller already bought the big recess outside her unit and she wanted to reno it but luckily she checked and reconfirmed during 1st and 2nd appointment. The purchase did not include the recess area. She decided to KIV the purchase (of the recess area) after HDB rejected her request to some differences in reno ideas.

hi hello

for this, i checked with the seller's agent and was told they oledi bog that area.

anyway, i will get my contractor to put in the reno permit for this area and see how's the reply lor....keke :)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
hi hello

for this, i checked with the seller's agent and was told they oledi bog that area.

anyway, i will get my contractor to put in the reno permit for this area and see how's the reply lor....keke :)

Hi Jessie, ur reno only $15k ah...can share what you will be doing?

 

Share this post


Link to post
Share on other sites
Hi Jessie, ur reno only $15k ah...can share what you will be doing?

hi hi

ok ok....later i will post here on the things i do :)

 

Share this post


Link to post
Share on other sites

ok, below are what i will be doing.

1. Supply and install 19ft top and bottom solid plywood kitchen cabinet c/w 1 dish rack and 2 glass door, laminate with ABS hard edging triming.

2. Supply and install 15ft length solid surface for kitchen cabinet and table worktop.

3. Supply and overlay homogenous tile at kitchen wall and flooring.

4. Supply and install L1200mm x H1100mm kitchen table c/w laminate finish.

5. Supply and lay corrugated board to protect living/bedrooms flooring

6. Supply and install inlet/outlet pipe for kitchen sink and washing machine.

7. Supply labour to hack timber panel along wall. 280sqft

8. Supply and install 2 x bi-fold door using acrylic panel and aluminium frame for 2 toilet.

9. Hacking and make good kitchen entrance

10. Supply labour to dismantle cornice at 3 bedroom .

11. Supply labour to dismantle MBR wardrobe and kitchen cabinet .

12. Supply labour to hack and make good 2 toilet metal door frame.

13. Supply and seal up ceiling with plaster board at kitchen entrance.

14. Supply and make good wall with cement screed at balcony wall.

15. Supply and install parition gysum board to seal up living room wall tile.

16. Supply and install parition gysum board for masterbedroom walk-in warerobe.

17. Supply labour to paint whole hse wrought iron

18. Supply labour sand haulage and clear away all debris

19. Supply and install flatted stainless steel rubbish bin

20. Supply labour to install bathroom accessories

21. Supply and install half natoh main door with lockset.

22. Supply and install 1200mm x 2100mm wrought iron main gate.

23. Supply and repair spalling concrete with anti corrosion paint and plastering.

 

Share this post


Link to post
Share on other sites
ok, below are what i will be doing.

1. Supply and install 19ft top and bottom solid plywood kitchen cabinet c/w 1 dish rack and 2 glass door, laminate with ABS hard edging triming.

2. Supply and install 15ft length solid surface for kitchen cabinet and table worktop.

3. Supply and overlay homogenous tile at kitchen wall and flooring.

4. Supply and install L1200mm x H1100mm kitchen table c/w laminate finish.

5. Supply and lay corrugated board to protect living/bedrooms flooring

6. Supply and install inlet/outlet pipe for kitchen sink and washing machine.

7. Supply labour to hack timber panel along wall. 280sqft

8. Supply and install 2 x bi-fold door using acrylic panel and aluminium frame for 2 toilet.

9. Hacking and make good kitchen entrance

10. Supply labour to dismantle cornice at 3 bedroom .

11. Supply labour to dismantle MBR wardrobe and kitchen cabinet .

12. Supply labour to hack and make good 2 toilet metal door frame.

13. Supply and seal up ceiling with plaster board at kitchen entrance.

14. Supply and make good wall with cement screed at balcony wall.

15. Supply and install parition gysum board to seal up living room wall tile.

16. Supply and install parition gysum board for masterbedroom walk-in warerobe.

17. Supply labour to paint whole hse wrought iron

18. Supply labour sand haulage and clear away all debris

19. Supply and install flatted stainless steel rubbish bin

20. Supply labour to install bathroom accessories

21. Supply and install half natoh main door with lockset.

22. Supply and install 1200mm x 2100mm wrought iron main gate.

23. Supply and repair spalling concrete with anti corrosion paint and plastering.

Hi,

All these for 15K? Seems to be a lot of work.

 

Share this post


Link to post
Share on other sites
Hi,

All these for 15K? Seems to be a lot of work.

Reverse the 15K to 51K makes more logic for so many things

 

Share this post


Link to post
Share on other sites

Hi All,

Just signed the OTP for my EM yesterday and stumbled upon this forum. Thank you all for sharing! Really learned a lot and now super worried about the renovation!!! :dunno:

 

Share this post


Link to post
Share on other sites

Went for tiles selection with my Contractor today, it was very posioning, end up selecting pricer(+$1.5) tile than original quoted. Only need to top up the tile cost......pocket burn one big hole.

Hi All,

Just signed the OTP for my EM yesterday and stumbled upon this forum. Thank you all for sharing! Really learned a lot and now super worried about the renovation!!! :dunno:

Welcome, where is your EM? How much if u don't mind?

 

Share this post


Link to post
Share on other sites
Went for tiles selection with my Contractor today, it was very posioning, end up selecting pricer(+$1.5) tile than original quoted. Only need to top up the tile cost......pocket burn one big hole.

Welcome, where is your EM? How much if u don't mind?

Hi chronograph,

Its at Tampines - Opp Century Sq. Valuation $514k (ex but for the location no choice).

 

Share this post


Link to post
Share on other sites
Reverse the 15K to 51K makes more logic for so many things

yes yes......it's 15k!

cos i did not do my flooring for living hall & 2nd floor mah.

 

Share this post


Link to post
Share on other sites

Am here..everyday log in at least once a day...

Ohh..ur contractor is zhiseng..some1 here pass me his contact too..interested to hire him since got some strong recommendations..

esp since u got estimated quote 15k..wow...

 

Share this post


Link to post
Share on other sites
Am here..everyday log in at least once a day...

Ohh..ur contractor is zhiseng..some1 here pass me his contact too..interested to hire him since got some strong recommendations..

esp since u got estimated quote 15k..wow...

hi 666

yes yes,...i m using Zhiseng.....Johnson.

he is a real nice guy and really honest....cos he will give us advise on things that we can cut cost and save.... :)

i will be meeting him tmrw at his office to select tiles :)

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×