Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
pslim

Jade Spring @ Yishun By Wawe Design

Recommended Posts

* Started hacking work

Kitchen entrance hacked, open concept :good:

20120408144611.jpg

* Followed by tiling

dsc08563ug.jpg

dsc08562am.jpg

dsc08561n.jpg

* Not forgetting my shower kerb at common toilet

20120408144853.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

* Electrical

Downlights and covelights arrangements? - :dunno:

20120408144746.jpg

20120408144659.jpg

20120408144647.jpg

20120408144639.jpg

20120408144630.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Master bedroom electrical, last minute inject for the electrician

20120408144838.jpg

* HDB cement screed before my laminated flooring from Supreme :sport-smiley-004:

20120408144807.jpg

20120408144755.jpg

20120408144917h.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Completed cemend screed for bedrooms

20120410121849.jpg

20120410121902.jpg

20120410121913.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* False ceiling on the way

20120410121734.jpg

20120410121742.jpg

20120410121746.jpg

* Master bedroom island false ceiling :good:

20120410121831.jpg

* Hacked kitchen patching :sport-smiley-004:

20120410122651.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Next is painting and laminate floorings

20120419150117.jpg

20120419150124.jpg

Master bedroom with platform :yamseng:

20120419150222.jpg

20120419150228.jpg

20120419150253.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* All set for lights installation

20120419150440.jpg

My downlights

20120419150426.jpg

Kitchen

20120420123449.jpg

Service yard

20120420123512.jpg

Bomb shelter

20120420123541.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Lightings

Bedrooms

20120420123601.jpg

20120420123608.jpg

Toilets

20120420123613.jpg

Master toilet

20120420123620.jpg

Master bedroom passageway

20120420123626.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Lightings on

Cove lights still need some fine tuning

20120426150235.jpg

20120426150241.jpg

Foyer

20120426150252.jpg

Kitchen

20120426150300.jpg

20120426150311.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Lightings

20120426150331.jpg

My favourite - Island lightings with remote control :good:

20120426150420.jpg

20120426150637.jpg

Edited by pslim
 

Share this post


Link to post
Share on other sites

* Toilet accessories

20120426150334.jpg

Not forgetting this big thing

20120426150426.jpg

* Thats all for now coz not much physical work done, for the past 2 weeks are 3D confirmations. Will try to post some of the designs Wee Kuang drew for me as well as my confirmation. Crossing fingers for my actual carpentries. :bow:

Edited by pslim
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×