filetofish 0 Report post Posted May 28, 2012 Day 36 - Carpentry has arrived! Lightings are installed!Shoe cabinet at the main door (still work-in-progress)Living room with TV console Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 28, 2012 Kitchen with cabinets (work-in-progress)MBR toilet with vanity shelves - the height is a bit low though... about 34 inches high. Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 29, 2012 Day 37 - Floor of bedrooms have been overlaid with laminate Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 29, 2012 I don't like these types of shelf brackets. Changed to these instead. Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Day 38 - Bedroom doors installed Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Day 40 - Progress on carpentryShoe cabinet at the main doorFeature wall to hide bomb shelter Living room with TV console Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Wardrobe (pole system) Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Here's the sketch of how the air-con trunking will be covered up.Cupboard installed. Share this post Link to post Share on other sites
casa 0 Report post Posted May 30, 2012 Wardrobe (pole system)Your pole system wardrobe looks nice and pole looks slim.May I know which contractor doing your wardrobe system??Is there any doors?? Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Your pole system wardrobe looks nice and pole looks slim.May I know which contractor doing your wardrobe system??Is there any doors??No doors, it's open concept. Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 No doors, it's open concept.I don't know the contractor, they were engaged by my ID. Share this post Link to post Share on other sites
filetofish 0 Report post Posted May 30, 2012 Day 41 - Electrician installed piping for opennet cables Share this post Link to post Share on other sites
casa 0 Report post Posted May 31, 2012 No doors, it's open concept.Indeed looks great but ladies personal wear have to be kept in drawers no exposure Your cabinet shelving idea is good too bad have done mine but no problem wait my parent's hse reno will use your idea Cheers Share this post Link to post Share on other sites
filetofish 0 Report post Posted June 4, 2012 Indeed looks great but ladies personal wear have to be kept in drawers no exposure Your cabinet shelving idea is good too bad have done mine but no problem wait my parent's hse reno will use your idea CheersThanks casa. Share this post Link to post Share on other sites
filetofish 0 Report post Posted June 4, 2012 (edited) Day 43 - Installed solid surface top in kitchen and bathroom accessoriesWhite solid surface top installed on kitchen cabinetCommon bathroomMBR bathroom Edited June 7, 2012 by filetofish Share this post Link to post Share on other sites