Suwanti Tan 0 Report post Posted June 6, 2012 (edited) Hi, Thanks for your reminder.Too excited about the progress when i visited the house and automatically forgotten to take the picture.Ok, here you go... The renovation work progress' pictures...Living room (My seatee wall at the window area is up, the cove light is done too)Our small storage below the stairs (will install tictac door and painted same color as our wall)Our beloved Master Bathroom (The bath tub is installed and it's working already!! Waiting for the bathroom Glass wall and door to be installed)Part of our Master bathroom (Waiting for the WC, sink and cabinet to be installed) Edited June 6, 2012 by WanDerWan Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 6, 2012 Our Master Bedroom, the partition is used to keep all the wires and wardrobe wallPart of Our Master BedroomOur Master Bedroom's cove light is done too!!Future kids room (There my beloved HTB in white!!!!)Future kids room (the partition is used to keep all the wires and wardrobe wall) Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 6, 2012 Part of Future kids wallOur Parquet floor is here!!!!! Oh yeah!!!And It's UP Up UP!!!! Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 6, 2012 Our stairs, ready for Parquet steps and afterwards installation of the glassPart of our Dining room and kitchen with common bathroomDining area Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 6, 2012 Kitchen AreaDish washing area with my fave tile!!Washing machine, Dryer and Fridge areaCooking area with my fave tiles!!! Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 6, 2012 We also change the BIG BIG pipe coz it's old and leaks!We will cover all big pipes with cabinetOur Kitchen and Dining area separator Wish to see everything with the cabinets already!!!!Oh ya, we bought all the LED light for the down light and the cove lights. Share this post Link to post Share on other sites
happymommy 0 Report post Posted June 16, 2012 Hi, saw the 3d design of your kitchen.Quite like the idea n layout, hope that if possible of you to share the quotationas i am also in the midst of getting my keys soon and looking for ID in the process.Thks for reading Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted June 20, 2012 Hi, saw the 3d design of your kitchen.Quite like the idea n layout, hope that if possible of you to share the quotationas i am also in the midst of getting my keys soon and looking for ID in the process.Thks for readingHi HappyMommy, i had just PM you the contractor details. Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 21, 2012 3 More weeks...About 3 more weeks we can start to move in already.Both my fiance and me feels so happy when we visited the house.Below are the updates:KITCHEN- Washing area: with super low dish drying rack and my fave rectangle tile (even when my contractor say that using tile might make my life harder. he suggested us to use glass, but i die die also want to have tiles ). The Dish drying rack glass, separator, sink and solid top is not ready yet.- Breakfast Table and Washing machine/Dryer Area: We installed 2 pendant bulb on top of our small small breakfast table. The breakfast table is not ready yet. But the white full length cabinet to keep all the washing detergent is ready. Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 21, 2012 - Cooking Cabinet: This cabinet located just below my hob. View of my hood and hob area, with my fave stacking microwave and oven. - Living room: Basically this room is ready, except the feature wall. (You might find that this room in 3D drawing is with white wall, without any feature wall. But our contractor suggest us to put a small feature wall to hide the cables, as we have alot of cables' machine and also a small bose system to install). Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 21, 2012 - Praying Hall: This is the sliding door to our study room, which we currently use as our big storage for my fiance business usage. (The room left untouched). we only change the door to match with the whole house feel.Praying Altar, is a must for the parents The first thing you see as soon you open the door. The Praying Crystal area. Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 21, 2012 - Master Bathroom: Bathtub is installed, Jacuzzi is ready, wc installed. Left with the cabinet, sink, solid top and mirror. - Master bedroom: Wardrobe is ready, but without the door. The rest of the thing still in progress- Parents Room: Bed head specially designed to be thick to avoid the trunking above head (due to feng shui). 2 small drawer below bed to keep things.Specially designed and BIG BIG BIG wardrobe (I want to have a BIG wardrobe like this too!! but too bad, it's parents room...). The tv in this room will be inside the wardrobe. so when the wardrobe open you will see tv, when it's closed, you cant see the tv. It's more or less like MAGIC... Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 21, 2012 (edited) - Parents Bathroom: The area where my fiance's mom choose the tiles and match it by herself, and it turns out nice... The shower, wc and sink up. Left with solid top and the cabinet.- Our Hope soon to be Kids room (Meanwhile: study room): We only need a simple wardrobe in this room, coz we dont know what our future kids will like.I'll update again soon!!! Edited July 22, 2012 by WanDerWan Share this post Link to post Share on other sites
potatoes 0 Report post Posted July 22, 2012 Nice progress.... I like ur superbig wardrobe Share this post Link to post Share on other sites
Suwanti Tan 0 Report post Posted July 29, 2012 Thanks alot Potatoes, will be updating the progress soon!! Share this post Link to post Share on other sites