ayazumi 0 Report post Posted March 21, 2012 (edited) Wow... I am shocked to see the half kitchen wall tiles still remain there. Luckily you went to the house to check. Seems like the demolition work is a bit slow. Your renovation started the same day as me too. Edited March 21, 2012 by ayazumi Share this post Link to post Share on other sites
May_dream1 14 Report post Posted March 21, 2012 Wow... I am shocked to see the half kitchen wall tiles still remain there. Luckily you went to the house to check. Seems like the demolition work is a bit slow. Your renovation started the same day as me too.His is bigger mah, 5 room. Maybe that's why the hacking takes longer. Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 21, 2012 (edited) I thk it's considered slow.. Im only hacking living n kitchen n toilets..None of debris is cleared yet., sand is placed at near rubbish shoot..Cos no place to put in hse.. Edited March 21, 2012 by muska1119 Share this post Link to post Share on other sites
beluga 1 Report post Posted March 21, 2012 My hacking is not that much.... Only kitchen and toilet.... Anyway, if he promised you by 4th may, it should be no further delay as he always pride himself to deliver on time. Aiyo... just start hacking only you get impatient liao.... haiz.... Share this post Link to post Share on other sites
Akitsuki 0 Report post Posted March 21, 2012 (edited) I thk it's considered slow.. Im only hacking living n kitchen n toilets..None of debris is cleared yet., sand is placed at near rubbish shoot..Cos no place to put in hse..Beluga always said surprise to see workers work late.. Mine out of 3 days only see them once when we come to check at 6:30pm..Our ID is the same guy by the way..mayb they dont wanna clear the job too fast.. .. so slowly do.. if i'm the worker and there is no rush.. i rather do 5 days instead of 3 days.. since alot of them gets daily pay.. do fast get this amount.. do slow also get same amount... anyway.. i rather they do slow and the quality is there... than do fast and have more things to rectify later... for tileing that is.. hacking nothing much to rectify.. haha.. dont hack 1 hole into the neighbour house can liao.. Edited March 21, 2012 by Akitsuki Share this post Link to post Share on other sites
beluga 1 Report post Posted March 21, 2012 We have more laborous work... All rooms with false ceiling and whole house laminate... Window and grills also all change. So, things definitely got to speed up... Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 22, 2012 (edited) Day 4 22Mar Got hm late and didn't manage to drop by.. So not sure of progress. Heard fr mum all debris were cleared.. Progress is much faster today.. But the head worker told her nothing much to see till next wk.. And she manage to pass the workers (~10 of them).. some beers be4 they knocked off.. Tomorrow will be discussion w aircon .. This Thomas fr Aktiff, is very on .. Willing to come 3x , 1st meet up for discussion , 2nd to run piping n final installation without extra charge. It's used by my parents hse be4. Edited March 22, 2012 by muska1119 Share this post Link to post Share on other sites
beluga 1 Report post Posted March 22, 2012 Day 4 22Mar Got hm late and didn't manage to drop by.. So not sure of progress. Heard fr mum all debris were cleared.. Progress is much faster today.. But the head worker told her nothing much to see till next wk.. And she manage to pass the workers (~10 of them).. some beers be4 they knocked off.. Tomorrow will be discussion w aircon .. This Thomas fr Aktiff, is very on .. Willing to come 3x , 1st meet up for discussion , 2nd to run piping n final installation without extra charge. It's used by my parents hse be4.Waa... You spoil market aa.... Next time, they come to my place asking for beer I jialat.... Hehehe....Now it is my turn that the progress is slow. Yesterday totally nobody came to do anything, which I think should at least come to scrape off the old paint, remove all the screw/nail residue and patch up of holes before proceeding with the painting. Haiz.... Now I know how you feel..... Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 23, 2012 Hah.. I only hv that few cans of beer at hm... Gifted by neighbor.. If they ask again also no more..My mum very happy to clear these fr her home ..Your place so fast gonna proceed to painting? Mine still long long way to go.. Plastering whole hse according to Cyrus will take 4/5 days.. Mine need to plaster even the ceiling as got the dot dot all over. Share this post Link to post Share on other sites
beluga 1 Report post Posted March 23, 2012 (edited) Hah.. I only hv that few cans of beer at hm... Gifted by neighbor.. If they ask again also no more..My mum very happy to clear these fr her home ..Your place so fast gonna proceed to painting? Mine still long long way to go.. Plastering whole hse according to Cyrus will take 4/5 days.. Mine need to plaster even the ceiling as got the dot dot all over.How much they quoted for plastering?Mine will jsut do touchup for any holes and marking from the old trunking.... I wanted to patch just one wall as there is a ridge between 2 slabs of pre-fab walls but was quoted 400, which I think bo hua.... Edited March 23, 2012 by beluga Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 23, 2012 2400 I thk.. And once plaster need to do whole hse rewiring Share this post Link to post Share on other sites
beluga 1 Report post Posted March 23, 2012 2400 I thk.. And once plaster need to do whole hse rewiringI see.... aiyo... Really tempted to replaster whole house Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 23, 2012 Mine is no choice .. If urs not obvious can save the $$.. It's really pay $ for something cannot see Share this post Link to post Share on other sites
beluga 1 Report post Posted March 23, 2012 Mine is no choice .. If urs not obvious can save the $$.. It's really pay $ for something cannot seeI just casually asked him, "eh, if want to plaster eh sai bor".... He retorted, "cannot laa.... I now in the midst of painting... " hahaha... Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 23, 2012 Actually few days ago I also changed myMind wanna open an opening at kitchen wall .. Cos I saw on tv program .. Looking good.. Then call him.. He also said too late heh.. Share this post Link to post Share on other sites