XTR 1 Report post Posted April 23, 2012 so far its heritage, poh joo, poh seng. royal franco and gr link is not that cheap. Share this post Link to post Share on other sites
revox88 0 Report post Posted April 23, 2012 I hope I can do this too as our common toilet is also very cramped.I saw that you bought the same WC as the one that I am interested in.Will you be able to tell me how much and where you got it from?Cannot rem exact price but it was listed at ard $400+. You can try Bathlabz at Ubi. Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 23, 2012 Cannot rem exact price but it was listed at ard $400+. You can try Bathlabz at Ubi.Thanks Revo, will try them. Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 23, 2012 so far its heritage, poh joo, poh seng. royal franco and gr link is not that cheap.My office is very near Jalan Besar, will try the ones mentioned above.Actually I was there one friday evening, but the place was closed by 7 PM.Till now we have tried a few and found Hoe Kee in IMM the best as far as prices go.As we are still looking for contractors and haven't really finalized our plans we did not really sit down and bargaon with any of them.Think as mentioned earlier here, best is to get everything from one showroom and then ask for discount.Where is Heritage? Share this post Link to post Share on other sites
fishponder 0 Report post Posted April 23, 2012 Hi, I recommend Heritage Bathroom at Geylang after trawling Jalan Besar and Balestier for comparison. Very reasonable prices and good service, v patient with my fickle mindedness plus bother to answer my countless questions. Check out the place! Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 23, 2012 Hi, I recommend Heritage Bathroom at Geylang after trawling Jalan Besar and Balestier for comparison. Very reasonable prices and good service, v patient with my fickle mindedness plus bother to answer my countless questions. Check out the place!Thanks fishponder, will try the place out.I am not fickle, but my wife certainly is. So she will like the place for sure. Share this post Link to post Share on other sites
XTR 1 Report post Posted April 23, 2012 My office is very near Jalan Besar, will try the ones mentioned above.Actually I was there one friday evening, but the place was closed by 7 PM.Till now we have tried a few and found Hoe Kee in IMM the best as far as prices go.As we are still looking for contractors and haven't really finalized our plans we did not really sit down and bargaon with any of them.Think as mentioned earlier here, best is to get everything from one showroom and then ask for discount.Where is Heritage?yah, i forgot about hoekee. each of them have their own cheapest items. so u need to find out 1 by 1. if no time, then just buy all from any of these shops should be fine. fishponder has already replied so yah, do check it out. Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 24, 2012 We got a quote today.NO DESCRIPTION AMOUNT (S$)A LIVING ROOM 1 supply and install L box at inner living room 700.00 2 to provide 12 no of lighting points and labour charge to install 12 PLC lights 600.00 * PLC lights to be provided by clients B COMMON TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 to install 2 aluminum panel and 3 glass for louver window 150.00 7 supply and install frameless tempered glass shower screen 580.00 8 to install partition box up for horizontal sewerage pipe 450.00 * slide and fold doors by others C MASTER BEDROOM TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 supply and install frameless tempered glass shower screen 580.00 7 to install partition to box up horizontal sewerage pipe 450.00 8 to provide a lighting points in the new box up and supply and install a fluorescent tube 160.00 9 to fabricate a suspended cabinet with Laminated finishing and ABS trimming 600.00 10 supply and install a solid surface top over new suspended cabinet 400.00 11 supply and install a mirror with a side cabinet attached 450.00 * slide and fold doors by others D KITCHEN 1 supply and install a tempered glass swing door 600.00I MASTER BEDROOM 1 to fabricate a door with full size mirror with selected Laminated closed to existing beside toilet entrance 250.00J PAINTING WORK 1 supply labour and material to paint whole house wall and ceiling ( ICI or NIPPON ) 1,800.00K ELECTRICAL WORK if reposition or additional point required , charges are as followed : 1 x 13a single socket $ 50 each 2 x 13 a socket $ 55 each SCV point $ 120 each tel point $ 55 each lighting points $ 40 each L OTHERS 1 HDB permit fee. F O C 2 Haulage service and cleaning up after completion F O C TOTAL : $15,070.00 Any comments on the above? Share this post Link to post Share on other sites
Nimzo 0 Report post Posted April 24, 2012 No kitchen cabinet?? Share this post Link to post Share on other sites
beluga 1 Report post Posted April 24, 2012 2 to provide 12 no of lighting points and labour charge to install 12 PLC lights 600.00The above sounds reasonable but additional item electrical price is expensive....1 x 13a single socket $ 50 each <== This is expensive2 x 13 a socket $ 55 each <=== This is reasonableSCV point $ 120 each <=== This is on the high sidetel point $ 55 each <=== Dunno....lighting points $ 40 each <=== Does it include installation If not, this is expensive Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 24, 2012 No kitchen cabinet??The present kitchen cabinets are pretty ok, plus we've got budget constraints. Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 24, 2012 2 to provide 12 no of lighting points and labour charge to install 12 PLC lights 600.00The above sounds reasonable but additional item electrical price is expensive....1 x 13a single socket $ 50 each <== This is expensive2 x 13 a socket $ 55 each <=== This is reasonableSCV point $ 120 each <=== This is on the high sidetel point $ 55 each <=== Dunno....lighting points $ 40 each <=== Does it include installation If not, this is expensiveThanks Beluga.1 x 13a single socket $ 50 each <== This is expensive - I thought so too, better get 2 sockets for $5 extra2 x 13 a socket $ 55 each <=== This is reasonableSCV point $ 120 each <=== This is on the high side - I'll have to speak with him about this although I do not plan to have anymore SCV points. I use MIO and that requires tel points ant not SCV.tel point $ 55 each <=== Dunno....lighting points $ 40 each <=== Does it include installation If not, this is expensive - I'll have to clarify this with him. Thanks for the advise. Share this post Link to post Share on other sites
Valerie Low 0 Report post Posted April 24, 2012 The price for painting is expensive. How many colours can you choose? Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 24, 2012 The price for painting is expensive. How many colours can you choose?The contractor did not specify, so I've asked him about that. From what I've seen here on RT, for a 5 room flat its normally between 1.3 to 1.6 K for 5 colours. You have any idea on this? Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted April 25, 2012 I got a revised quote after I queried a few items.This is what I got:NO DESCRIPTION AMOUNT (S$) A LIVING ROOM 1 supply and install L box at inner living room 700.00 2 to provide 12 no of lighting points and labour charge to install 12 PLC lights 600.00 * PLC lights to be provided by clients B COMMON TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 to install 2 aluminum panel and 3 glass for louver window 150.00 7 supply and install frameless tempered glass shower screen 580.00 8 to install partition box up for horizontal sewerage pipe 450.00 * slide and fold doors by others C MASTER BEDROOM TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 supply and install frameless tempered glass shower screen 580.00 7 to install partition to box up horizontal sewerage pipe 450.00 8 to provide a lighting points in the new box up and supply and install a fluorescent tube 160.00 9 to fabricate a suspended cabinet with Laminated finishing and ABS trimming 600.00 10 supply and install a solid surface top over new suspended cabinet 400.00 11 supply and install a mirror with a side cabinet attached 450.00 * slide and fold doors by others D KITCHEN 1 supply and install a tempered glass swing door 600.00 E PLUMBING WORK 1 supply and install stainless steel pipe with chrome fitting for whole house water supply with hot water point to 2 shower and a wash hand basin with hot water to 2 shower point and 2 wash hand basin ( surface piping ) 1,000.00 2 labour charge to install 2 toilet bowl and 2 wash hand basin including remove existing 280.00 * toilet bowl , wash hand basin to be provided by clients F MASTER BEDROOM 1 to fabricate a door with full size mirror with selected Laminated closed to existing beside toilet entrance 250.00 G PAINTING WORK 1 supply labour and material to paint whole house wall and ceiling ( ICI or NIPPON ) ( 4 clolours excluding White ) 1,800.00 H ELECTRICAL WORK if reposition or additional point required , charges are as followed : 1 x 13a single socket $ 50 each 2 x 13 a socket $ 55 each SCV point $ 120 each tel point $ 55 each lighting points $ 40 each I OTHERS 1 HDB permit fee. F O C 2 Haulage service and cleaning up after completion F O C 3 labour charge to install a light near the entrance of the MBR toilet F O C 4 supply labour to install bath room accessories F O C TOTAL : $16,350.00 Share this post Link to post Share on other sites