ExcitedFirstTimer 0 Report post Posted April 30, 2012 The house as it is now:Living/diningMaster BedroomStudyKitchenService yard Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted May 2, 2012 Visited Soon Bee Huat yesterday and chose the following for the bathroomMaster bedroom toilet:Common toilet: Share this post Link to post Share on other sites
casa 0 Report post Posted May 2, 2012 The house as it is now:Living/diningMaster BedroomStudyKitchenService yardYour kitchen seems well maintain N still look niceHappy reno Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted May 2, 2012 Your kitchen seems well maintain N still look niceHappy reno Thanks Casa!You are right, the house has been well maintained. So we are doing minimal reno. Share this post Link to post Share on other sites
EoneKhaled 0 Report post Posted May 3, 2012 Can PM me yr ID contact ThanksWe got a quote today.NO DESCRIPTION AMOUNT (S$)A LIVING ROOM 1 supply and install L box at inner living room 700.00 2 to provide 12 no of lighting points and labour charge to install 12 PLC lights 600.00 * PLC lights to be provided by clients B COMMON TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 to install 2 aluminum panel and 3 glass for louver window 150.00 7 supply and install frameless tempered glass shower screen 580.00 8 to install partition box up for horizontal sewerage pipe 450.00 * slide and fold doors by others C MASTER BEDROOM TOILET ( TILES RANGE FORM $ 2. 8 TO $ 3 / PER SQFT ) 1 to apply a layer of bonding agent to existing wall tiles 200.00 2 supply and overlay ceramic wall tiles up to ceiling height 2,000.00 3 to hack away existing floor tiles and clear debris to NEA designated dumping ground 600.00 4 supply and lay ceramic / homogenous floor tiles 550.00 5 to provide water proofing membrane with HDB required prepack cement 300.00 6 supply and install frameless tempered glass shower screen 580.00 7 to install partition to box up horizontal sewerage pipe 450.00 8 to provide a lighting points in the new box up and supply and install a fluorescent tube 160.00 9 to fabricate a suspended cabinet with Laminated finishing and ABS trimming 600.00 10 supply and install a solid surface top over new suspended cabinet 400.00 11 supply and install a mirror with a side cabinet attached 450.00 * slide and fold doors by others D KITCHEN 1 supply and install a tempered glass swing door 600.00I MASTER BEDROOM 1 to fabricate a door with full size mirror with selected Laminated closed to existing beside toilet entrance 250.00J PAINTING WORK 1 supply labour and material to paint whole house wall and ceiling ( ICI or NIPPON ) 1,800.00K ELECTRICAL WORK if reposition or additional point required , charges are as followed : 1 x 13a single socket $ 50 each 2 x 13 a socket $ 55 each SCV point $ 120 each tel point $ 55 each lighting points $ 40 each L OTHERS 1 HDB permit fee. F O C 2 Haulage service and cleaning up after completion F O C TOTAL : $15,070.00 Any comments on the above? Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted May 4, 2012 Can PM me yr ID contact Thanks PM'ed Share this post Link to post Share on other sites
ahlipz 0 Report post Posted May 26, 2012 Which store in IMM did you see the Haiku fan? Share this post Link to post Share on other sites
EoneKhaled 0 Report post Posted May 26, 2012 PM'edThanks Share this post Link to post Share on other sites
franciz 0 Report post Posted May 28, 2012 Thanks fishponder, will try the place out.I am not fickle, but my wife certainly is. So she will like the place for sure.I suppose I saw u there during my first visit. U & yr wife returned to the shop at around 7pm? Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted May 29, 2012 Which store in IMM did you see the Haiku fan? I saw it at 'Gallery of Lights by Best Tech' on the third floor.Right now they say they are out of stock. I got mine directly from Relite. Share this post Link to post Share on other sites
ExcitedFirstTimer 0 Report post Posted May 29, 2012 I suppose I saw u there during my first visit. U & yr wife returned to the shop at around 7pm?Maybe you saw someone else, I was there with my wife during daylight hours Share this post Link to post Share on other sites