beluga 1 Report post Posted March 19, 2012 I like the dining set when I saw it in Furniture Mall, but we can't afford.Ask me to buy just that dining set also I won't as it's too **** expensive.... Share this post Link to post Share on other sites
beluga 1 Report post Posted March 19, 2012 (edited) A lot of things got done today1) False ceiling is all done....2) City Gas Heater installed. Due to the area between the service yard and the kitchen are all beams, there is no way to drill through and thus have to navigate around.... Looks ugly but bo pian... haiz.... Edited March 19, 2012 by beluga Share this post Link to post Share on other sites
beluga 1 Report post Posted March 19, 2012 (edited) 3) Toilet bowls and rain showers installedCommon toilet...If you notice, the space between the rain shower and the toilet bowl is very narrow. The chosen basin had to change to a small ones like the one below:MBR toilet... Edited March 19, 2012 by beluga Share this post Link to post Share on other sites
beluga 1 Report post Posted March 19, 2012 (edited) 4) Discussed with the carpenter on the details of the carpentry.5) Went to change the sink and lighting shop to modify some configuration after knowing the details of the carpentry....Next to be done, painting and then laminate flooring. Edited March 19, 2012 by beluga Share this post Link to post Share on other sites
tankee 0 Report post Posted March 19, 2012 4) Discussed with the carpenter on the details of the carpentry.5) Went to change the sink and lighting shop to modify some configuration after knowing the details of the carpentry....Next to be done, painting and then laminate flooring.Good progress Pal. Share this post Link to post Share on other sites
beluga 1 Report post Posted March 19, 2012 Good progress Pal.Yea... Now, next worry is when can the carpenter deliver the carpentry stuff.. Share this post Link to post Share on other sites
ayazumi 0 Report post Posted March 19, 2012 (edited) Once carpentry is up, you wish your renovation don't end so soon because your next biggest worry will be moving your barang barang to new house Edited March 19, 2012 by ayazumi Share this post Link to post Share on other sites
beluga 1 Report post Posted March 19, 2012 Once carpentry is up, you wish your renovation don't end so soon because your next biggest worry will be moving your barang barang to new houseThat one less worrying coz my biggest worry is to be able to shift by april 15th. Moving is something which we should be able to control in term of timing.... Share this post Link to post Share on other sites
muska1119 1 Report post Posted March 20, 2012 So fast urs gonna be ready? Mine will cross to may.. Faint.. Share this post Link to post Share on other sites
beluga 1 Report post Posted March 20, 2012 (edited) So fast urs gonna be ready? Mine will cross to may.. Faint..From what I can see, it should be painting >> floor laminating >> door/window grill? >> carpentry >> final plumbing/glass panel >> lighting fixup >> final touch upGot to work closely with ID to maximise their efficiency. Some of the stuff I originally scheduled requires changing as he kpkb will restrict his planning. Do tell me if you need help in network planning... Edited March 20, 2012 by beluga Share this post Link to post Share on other sites
ayazumi 0 Report post Posted March 20, 2012 Why April 15? Share this post Link to post Share on other sites
beluga 1 Report post Posted March 20, 2012 Why April 15?FSM say we must shift on that day to have a good life.... Hehehe... kidding....We are still living at our ex-apartment. The new owner wants us to clear this place by April 15th. Share this post Link to post Share on other sites
ayazumi 0 Report post Posted March 20, 2012 FSM say we must shift on that day to have a good life.... Hehehe... kidding....We are still living at our ex-apartment. The new owner wants us to clear this place by April 15th.Oh I see. One more month to go. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted March 20, 2012 That one less worrying coz my biggest worry is to be able to shift by april 15th. Moving is something which we should be able to control in term of timing....4 more weeks, not a problem lah. Still got a lot of time! Share this post Link to post Share on other sites
beluga 1 Report post Posted March 20, 2012 Now hunting for movers.A lot of barang-barang but not much big items except- a single bed/frame- a queen size bed/frame- piano- washing machine/dryerElite Mover quoted us 960! Currently sourcing for others...Calling 138 and soon seng to check out... Share this post Link to post Share on other sites