sistasi 0 Report post Posted November 22, 2011 Hi all,Just want to know is overlaying 1 toilet tile for $600 is it expensive?? Share this post Link to post Share on other sites
Simontsh 0 Report post Posted November 22, 2011 (edited) Hi all,Just want to know is overlaying 1 toilet tile for $600 is it expensive??depends on materials, quality and workmanship.Its like asking $100k for a car expensive or not.if its a chery QQ then yeah....but what if its a BMW 7 Series? 100k i think alot of people will grab. Edited November 22, 2011 by Simontsh Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted November 22, 2011 Mind posting your tiles psf and size of your toilet? Share this post Link to post Share on other sites
sistasi 0 Report post Posted November 22, 2011 i think each tile cost $2.80 and i think he only ordered 40pcs tilesmy toilet is only ard this size 226cm x 145cm Share this post Link to post Share on other sites
Simontsh 0 Report post Posted November 22, 2011 we are talking about 60cm by 60cm tiles i guess? can share its what type of tiles? wad material? Share this post Link to post Share on other sites
sistasi 0 Report post Posted November 22, 2011 hmm im not sure about the material but its the rough one..the cost is around 2.80$/tile when I went to select there yest.so is $600 ex or it's normal? Share this post Link to post Share on other sites
TooT 0 Report post Posted November 22, 2011 hmm im not sure about the material but its the rough one..the cost is around 2.80$/tile when I went to select there yest.so is $600 ex or it's normal?whole toilet floor and wall tiles? or a portion of it? Share this post Link to post Share on other sites
sistasi 0 Report post Posted November 22, 2011 the whole toilet floor, wall is not included. Share this post Link to post Share on other sites
freddyprince 0 Report post Posted November 23, 2011 I am actually looking for a tiler to do Overlay for 2 toilet and change basin toilet bowl as well. But alot of quote given is the almost the same price as your. But If you really calculate the cost for material is more or less than a hundred only. Meaning they earn ard 70%. So right now I am looking fOr tiling cOntractor directly see got cheaper anot Share this post Link to post Share on other sites
sistasi 0 Report post Posted November 24, 2011 Ya, that's wat I was thinking too..Thanks Freddy for sharing your view. Share this post Link to post Share on other sites