Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ncsl999

Cck 5I Plats

Recommended Posts

Hi Everyone,

Been doing research for months before we got our keys in this 28 Oct, to our 1st home a 5i unit in the CCK area. Its an 18 years old flat, we are the 3rd owners, the flat is in the original condition but very well maintained by the 2nd owner@our seller.

ncsl999

Edited by ncsl999
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Floor Plan

Renovation Start Date 1.11.2011

ID : Matrix Concept (Alvin Aw)

Projected Reno Cost : 48,400k (including air-con Mistsuibishi System 4)

Solid Timber Strip Flooring: Supreme Floor. (Burmese Teak Wood) for 3 bedrooms cost 6.8K

CCKOriginalFloorPlan.jpg

Edited by ncsl999
 

Share this post


Link to post
Share on other sites

Tried to contact many ID at the expo, non came back with a quotation. Finally found an ID cum contractor which can match my budget to revamp this 18 yrs old flat.

My id is Alvin from Matrix Concept. Will continue to post most pictures .. as I have not the time to load many of the reno .. picture ..

The reno is now already a month and all floor & wall tiles are up...

ncsl999

 

Share this post


Link to post
Share on other sites

Reno progress delayed due to false ceiling issue at the living & dinning area. The stupid ceiling is lower by 3inches .. than other areas of the house, hence after the false ceiling is up the whole living & dinning is so much lower than the rest of the place.. so now got a unbalance view from the living to study and kitchen.

As I have done most of the layout sketches myself .. which includes all the 'Needs" of all the family members. Below are the changes:

1. I will be hacking away the store room to give more space to the MBR.

2. Mother inlaw says Toilet inside Kitchen no good for feng shui. Anyway we have overcome this problem by create a false wall using hollow block to separate the kitchen area from the toilet.

I will posting only manual drawn skecthes as my contractor cum ID does not provide 3D. So we have just imagine hard... god help us :) hee hee

Edited by ncsl999
 

Share this post


Link to post
Share on other sites

Conclusion the most part of the false ceiling needs to be taken down and changed design. My Id guy: Alvin nearly faint when we told him to tear the false ceiling down...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×