This evening I went over to our new house after work and see that the capentry work is 90% done. contractor has advised that the solid surface top will up this thursday. Just hope that my house can be fully done and clean up latest by early dec 2011. I have arranged with all the suppliers to deliver the furnitures and electronic items on 15 Dec 2011 and curtains will also install by that week as well. just pray hard that we can move in our new house by mid dec 2011.

following are the photos of the capentry works for bedrooms, kitchen and living room:

bedroom 2 wardrobe

SDC10953.jpg

SDC10952.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

master bedroom shelves, tv and study table

SDC10945.jpg

kids room study table with drawers and top cabinet and bay window laminate

SDC10944.jpg

SDC10943.jpg

kids room wardrobe

SDC10942.jpg

Edited by sccy2
 

Share this post


Link to post
Share on other sites

my camera got problem can't take the real picture of the shoe cabinet and feature wall - the colour of the white is actually glossy pearly white without the lines.

 

Share this post


Link to post
Share on other sites

Yes, I believe their kitchen is similar to my layout. But mine definitely can't fit a 2 door fridge. Until now, I still cannot phantom why my kitchen is smaller than a 4room unit. Haha.

Anyway, it looks almost completed! Your MBR can fit a study table. Wow. How many ft is your wardrobe? How's the workmanship for cpg btw?

I think the leadtime to do the curtains shld be fast - shld be 1-2 wks leadtime (also need to depends on the supplier schedule - seems now is coming year-end - will be busy). For me I have advised my curtains to be installed on the week 12-16 Dec 2011 but my wooden blinds will be delayed as materials imported delay (just hope that can do it by Dec'11). Yesterday I went to my friend hse warming - she stays in the condo..her curtains for living room and 3 bedrooms only S$1,200.

your kitchen can't fit a fridge but I went to blk 269A a 5 rm unit that my contractor has done - kitchen is small but the owner still get a 2 door side by side fridge - the sink is near the windows which outside is the aircon ledge and the cooking area is just opposite the toilet...i find it so crampy.

 

Share this post


Link to post
Share on other sites

Hi,

Nice blog! :)

I noticed your living room has no downlights? Just T5 side lightings it seems. Are those bright enough to light up the whole living room? :yamseng:

Thanks :D

I do have downlights but they are at the other end of the living room where the sofa is situated. They are 3 pcs of 6 1/2 inch downlights there but the switch for these downlights are yet to install as switch is situated at the house shelter feature wall.

SDC10929.jpg

SDC10837.jpg

 

Share this post


Link to post
Share on other sites

Yes, I believe their kitchen is similar to my layout. But mine definitely can't fit a 2 door fridge. Until now, I still cannot phantom why my kitchen is smaller than a 4room unit. Haha.

Anyway, it looks almost completed! Your MBR can fit a study table. Wow. How many ft is your wardrobe? How's the workmanship for cpg btw?

Oh yeah, my reno is almost 85 - 90% completed - everything should be ready latest by next week (cross my fingers :P )

the study table is just like a L-shape table with 3 drawers which link to the wardrobe so i can put my small TV (22") there or work/surf net with my laptop on the longer side of the L-shape desk. My wardrobe is 6ft but i find that the contractor actually get the capenter to do the wardrobe more than 6ft as it cover up the whole wall. So far i find the workmanship ok and i did see the workers doing and talk to them ..we are happy wif their workmanship.

So yr house reno already start? HDB already approved the hacking permit?

Edited by sccy2
 

Share this post


Link to post
Share on other sites

Thanks :D

I do have downlights but they are at the other end of the living room where the sofa is situated. They are 3 pcs of 6 1/2 inch downlights there but the switch for these downlights are yet to install as switch is situated at the house shelter feature wall.

SDC10929.jpg

SDC10837.jpg

OIC... :) Thanks. :P

 

Share this post


Link to post
Share on other sites

That's really nice! You must be busy with moving next week. Post your final pics! haha

My hacking has finally completed. We went down yesterday and they build back half the wall. Finally there's some progress!

Oh yeah, my reno is almost 85 - 90% completed - everything should be ready latest by next week (cross my fingers :P )

the study table is just like a L-shape table with 3 drawers which link to the wardrobe so i can put my small TV (22") there or work/surf net with my laptop on the longer side of the L-shape desk. My wardrobe is 6ft but i find that the contractor actually get the capenter to do the wardrobe more than 6ft as it cover up the whole wall. So far i find the workmanship ok and i did see the workers doing and talk to them ..we are happy wif their workmanship.

So yr house reno already start? HDB already approved the hacking permit?

 

Share this post


Link to post
Share on other sites

That's really nice! You must be busy with moving next week. Post your final pics! haha

My hacking has finally completed. We went down yesterday and they build back half the wall. Finally there's some progress!

Thanks sis! still can't do anything this week - just contacted the contractor and he said only can do polishing of the parquet flooring for the 3 bedrooms this Friday (still need to let it dry up for @ least 2 days) then next week will do the necessary drilling for clock, toilet accessories, etc and last whole house cleaning (just hope everything can be done before 15 Dec as all my furniture will be coming on that day)-cross my fingers

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×