alannn 0 Report post Posted November 11, 2011 Can anyone advise how long does the false ceiling work take? Say for a room 3m by 6m, normal false ceiling thru out. Why I ask because I am intending to do some ceiling work on my existing home(living room) with my family staying in. Was wondering if the dust and mess bearable if the work Last only 2-3 days. Share this post Link to post Share on other sites