SClofthouse 0 Report post Posted November 15, 2011 So many EM owners here. Wow, the 3D drawings speaks a thousand words.. Share this post Link to post Share on other sites
slyphy 0 Report post Posted November 16, 2011 (edited) And here's the laminate selection so far... Edited November 16, 2011 by slyphy Share this post Link to post Share on other sites
slyphy 0 Report post Posted November 16, 2011 Lorenzo Sofa purchased at S'pore Expo furniture show... Share this post Link to post Share on other sites
slyphy 0 Report post Posted November 20, 2011 Here's the revised 3D fr kitchen. Had changed swop the position for fridge and the sink at dry area & changed the laminate to a plain white for simplicity. Share this post Link to post Share on other sites
slyphy 0 Report post Posted November 20, 2011 Seems like all my shopping list almost completed.Updated as fllw :1. Lorenzo Sofa2. Electrolux Oven 3. Electrolux stove4. Electolux Island Hoob (tis is really painful coz is damp ex)5. Electrolux Dryer6. Fisher & Paykel Fridge7. KDK Ceiling Fan8. Whole hse lighting (include a crystal light for my dining area) 9. Toilet Accessories (tis cost a bomb too)Balance item need to purchase :1. 2 x Super Single Mattress (1 bed frame/divan is needed)2. Coffee Table (will decided on this when we move in, afraid may not have enough place)And next sourcing for mover...so far I only heard of Shalom Mover, does anyone know of any reliable mover?And lastly, would be applying reno permit fr next week..Target Schedule :1 Dec 2011 : 2nd appt. for key collection...yeah 2 Dec 2011 : Hacking Day...3 Dec to 4 Jan : laying of granite on 1st floor, carpentry on 2nd floor, all the 3 toilets etc5 Jan : General CleaningStop work and restart after CNY...Will start updating the progress fr early Dec As it's near CNY, my ID told me that reno will stop on 1st Jan 2012..which means he will only be able to complete my reno for 2nd floor. 1st floor reno (carpentry work for kitchen & TV console) to be continued after CNY no choice but to accept... Share this post Link to post Share on other sites
potatoes 0 Report post Posted November 20, 2011 And next sourcing for mover...so far I only heard of Shalom Mover, does anyone know of any reliable mover?Stop work and restart after CNY...Will start updating the progress fr early Dec As it's near CNY, my ID told me that reno will stop on 1st Jan 2012..which means he will only be able to complete my reno for 2nd floor. 1st floor reno (carpentry work for kitchen & TV console) to be continued after CNY no choice but to accept...I have used Breakthrough Missions for the 3rd time running..... u may want to try them. Price is also reasonable.Person to contact is Vincent / RaymondContgrats on getting ur keys soon. Sorry to hear about the break in your reno work in 2012 .... I believe many of the workers are M'sians..... hope things will work out well for u and have a smooth reno Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 I have used Breakthrough Missions for the 3rd time running..... u may want to try them. Price is also reasonable.Person to contact is Vincent / RaymondContgrats on getting ur keys soon. Sorry to hear about the break in your reno work in 2012 .... I believe many of the workers are M'sians..... hope things will work out well for u and have a smooth reno Thanks for the info...will try to check on their quote! Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 Finally..collected my key on 1 Dec...our whole family were so excited and we went straight to our new home for door opening ceremony....here's some pic to share..Key collected Open Door ceremony Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 And here's some photos on the before reno...Photos of 1st Floor Living HallKitchenDining AreaStairs Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 (edited) Proceeding to 2nd Floor....Bed Room 1 & 2...Very Small....Common ToiletEntrance to Master Bedroom & Master Toilet...Master Bedrm... Edited December 3, 2011 by slyphy Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 2 Dec - 1st Day of hacking process...(ID very efficient...started hacking the next day after key collection)Luckily we had apply the reno permit way before key collection...thank goodness! Here's some pohotos of the hacking...am actually quite surprise that so much can be done with just one day... Share this post Link to post Share on other sites
yaolong 0 Report post Posted December 3, 2011 Ur house looks like move-in conditions... Very nice ma... Sure paid quite a sum for COV? Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 Will continue to post the reno process...Am so anxious to see the effect of the black galaxy floor tile when layed....according to ID shld be up by mid Dec...Now praying for everything to go smoothly... Share this post Link to post Share on other sites
slyphy 0 Report post Posted December 3, 2011 (edited) Ur house looks like move-in conditions... Very nice ma... Sure paid quite a sum for COV?Well, u're actually right...the owner maintained it quite well...so it's actually move in condition with some minor touch up.But we don't like the design so decided to redo the whole hse...except for the paquet flooring on the stairs & 2nd floor no change... Edited December 3, 2011 by slyphy Share this post Link to post Share on other sites
Jeep3 0 Report post Posted December 3, 2011 Wow nice 3ds! Im also currently renovating my em. Guess what? My ID suggested having dry and wet kitchen as well!Cant wait to move in soon. So excited for u also! Share this post Link to post Share on other sites