merzi 0 Report post Posted November 3, 2011 (edited) Finally after waiting for 2.5 years, the wait is over.... We will be collecting the keys this month. We are still searching for the best ID or contractor. Hence here's the shortlisted IDs:- Wawe Design (Wee Kuang)- DeFong Design Interior (Wong)- Baroque Design (Shawn)And here's our floorplan.... Edited February 9, 2012 by merzi Share this post Link to post Share on other sites
merzi 0 Report post Posted November 3, 2011 (edited) We've collected the keys last Saturday and took some pictures of the house.... Edited January 31, 2012 by merzi Share this post Link to post Share on other sites
merzi 0 Report post Posted January 31, 2012 (edited) Edited January 31, 2012 by merzi Share this post Link to post Share on other sites
merzi 0 Report post Posted January 31, 2012 (edited) Renovation will start after Aircon Installation This Friday.... And we've selected Wawe Design as our Contractor... Edited January 31, 2012 by merzi Share this post Link to post Share on other sites
pinkwhale 0 Report post Posted January 31, 2012 Welcome Arcadian!!! Share this post Link to post Share on other sites
merzi 0 Report post Posted January 31, 2012 Welcome Arcadian!!!Haha! Helo2... You also from Arcadia? Which block? Share this post Link to post Share on other sites
mummymantras 0 Report post Posted January 31, 2012 And here's our floorplan.... Interesting layout! In most of the floorplans I've seen so far, the positions of the master bedroom and bedroom 3 would be swopped.So, are you planning on making any substantial changes to your place? Share this post Link to post Share on other sites
pinkwhale 0 Report post Posted January 31, 2012 Haha! Helo2... You also from Arcadia? Which block? I'm from 288A, also having a Tblog here. Reno in the mid already. Will frequent your Tblog too Share this post Link to post Share on other sites
merzi 0 Report post Posted February 1, 2012 I'm from 288A, also having a Tblog here. Reno in the mid already. Will frequent your Tblog tooHaha! Ok2... I'm starting my reno this friday.... Will post more pictures here! Share this post Link to post Share on other sites
merzi 0 Report post Posted February 9, 2012 (edited) Sorry people. Been very busy with the renovation. Some updates:Started our Renovation last week. Aircon Installation was from Gain City. Very nice people and on the same day my electrician did the wiring. And yesterday we came down to take a look, false ceiling, shower kerb and kitchen base has all been done! Talking about fast! Quite impressed. Painting will be done over this few days and Carpentary will be up over next week. Ok i'll post some pictures:Daughter's RoomMaster BedroomGuest's Room Edited February 9, 2012 by merzi Share this post Link to post Share on other sites
Hoo8899 0 Report post Posted February 9, 2012 Moving soon hur? Congrat!! Share this post Link to post Share on other sites
merzi 0 Report post Posted February 9, 2012 (edited) Shower Kerb at Common ToiletShower Kerb at Master ToiletWiring(Living Area) Edited February 9, 2012 by merzi Share this post Link to post Share on other sites
merzi 0 Report post Posted February 9, 2012 (edited) Wiring (Living Area)Wiring (Dining Area) Edited February 9, 2012 by merzi Share this post Link to post Share on other sites
NeoBY 1 Report post Posted February 9, 2012 How come your trunking is outside of the false ceiling? Share this post Link to post Share on other sites
merzi 0 Report post Posted February 9, 2012 Moving soon hur? Congrat!!Heh! Yup, from the progress of it, we can move in end of feb.... Share this post Link to post Share on other sites