audC 0 Report post Posted October 12, 2011 Hi, I need urgent help to vet e quotation as my mom wants to start e reno by 20 Oct. We live in a 4-rm HDB and we will have both walls of our kitchen built with cabinets w counter tops - one dry pantry and one wet. Both of e same length, abt 11-12ft in length I guess?I think it's quite overpriced but quotes frm 2 contractors were abt $27k. Pls help! Thanks!!KITCHEN1. Floor Tiling- 1,6002.Wall Tiling- 2,5003.Cabinet ,Fridge & Washinfg Machine Base- 3504.Construct Sink-Cooker concrete support- 800 KITCHEN TOILET1. Floor Tiling C/W WaterProofing- 9002. Wall Tiling- 1,800 MASTER TOILET1. Floor Tiling C/W WaterProofing- 9002. Wall Tiling- 1,8003.Shower Kerb- 1504.Vanity Top c/w mirror- 6505.Shower Screen- 750 CARPENTRY1.Kitchen Cabinet in laminate finish C/W ABS Triming- 2,0002.Breakfast cum Dining table- 5503.Kitchen table top granite top,dry & wet Area- 4,5004.Laundry wall hung Cabinet- 3005.Kitchen cabinet in lammate finish c/w ABS trimming,wet area(27’L)- 2,7006.Wall Panel in Laminate finish to Prayer Area- 400 PLUMBING1.Copper piping to kitchen 2Toilets (exclude hot water)- 5502.Install 2 nos WCpedestar- 3003.Install 2 nos Basins- 1604.Install 1 no Kitchen sink top- 405.Provide inlet &outlet piping for basin,sink &washing machine- 250 HACKING & REMOVAL OF DEBIN’S1.Hacking to kitchen & 2 nos toilets including removal of debn’s- 2,200 OTHERS1.Provide floor Protection- 2002.Cleaning- FOC3.2nos Toilet Doors- 600 TOTAL $ 26,950 Share this post Link to post Share on other sites
shawncck 4 Report post Posted October 12, 2011 Hi, I need urgent help to vet e quotation as my mom wants to start e reno by 20 Oct. We live in a 4-rm HDB and we will have both walls of our kitchen built with cabinets w counter tops - one dry pantry and one wet. Both of e same length, abt 11-12ft in length I guess?I think it's quite overpriced but quotes frm 2 contractors were abt $27k. Pls help! Thanks!!KITCHEN1. Floor Tiling- 1,6002.Wall Tiling- 2,5003.Cabinet ,Fridge & Washinfg Machine Base- 3504.Construct Sink-Cooker concrete support- 800 KITCHEN TOILET1. Floor Tiling C/W WaterProofing- 9002. Wall Tiling- 1,800 MASTER TOILET1. Floor Tiling C/W WaterProofing- 9002. Wall Tiling- 1,8003.Shower Kerb- 1504.Vanity Top c/w mirror- 6505.Shower Screen- 750 CARPENTRY1.Kitchen Cabinet in laminate finish C/W ABS Triming- 2,0002.Breakfast cum Dining table- 5503.Kitchen table top granite top,dry & wet Area- 4,5004.Laundry wall hung Cabinet- 3005.Kitchen cabinet in lammate finish c/w ABS trimming,wet area(27’L)- 2,7006.Wall Panel in Laminate finish to Prayer Area- 400 PLUMBING1.Copper piping to kitchen 2Toilets (exclude hot water)- 5502.Install 2 nos WCpedestar- 3003.Install 2 nos Basins- 1604.Install 1 no Kitchen sink top- 405.Provide inlet &outlet piping for basin,sink &washing machine- 250 HACKING & REMOVAL OF DEBIN’S1.Hacking to kitchen & 2 nos toilets including removal of debn’s- 2,200 OTHERS1.Provide floor Protection- 2002.Cleaning- FOC3.2nos Toilet Doors- 600 TOTAL $ 26,950 OMG, I did my 4 rm flat total only cost 28k plus.... Urs is far over quote..... Go look for another.... Share this post Link to post Share on other sites
audC 0 Report post Posted October 12, 2011 But my home's at least 15yrs now. Could it be coz of all e demolishing and rebuilding? Idk. Could u give me ur contractor's contact? Share this post Link to post Share on other sites
Tanhs 0 Report post Posted October 12, 2011 I think you call this number for quotation, their package for kitchen & 2 toilets only 9800 include hacking. 62591800. Try no harm. Share this post Link to post Share on other sites
audC 0 Report post Posted October 13, 2011 I think you call this number for quotation, their package for kitchen & 2 toilets only 9800 include hacking. 62591800. Try no harm.Thanks Tan! Share this post Link to post Share on other sites
renoseeker 0 Report post Posted October 13, 2011 Your quote is vague, maybe can provide floor plan to see?Carpentry is quite ex btw. Hacking and haulage also a bit ex for only 2 toilets, 1 kitchen.Can also try to ask for more FOC for standard stuff like floor protection, install sink and basin. Share this post Link to post Share on other sites
audC 0 Report post Posted October 14, 2011 Your quote is vague, maybe can provide floor plan to see?Carpentry is quite ex btw. Hacking and haulage also a bit ex for only 2 toilets, 1 kitchen.Can also try to ask for more FOC for standard stuff like floor protection, install sink and basin.Okay thanks!! Share this post Link to post Share on other sites
airconlin 0 Report post Posted October 16, 2011 Okay thanks!!Must ask ID to give quantity of each item and unit price.They have no way to create quotations without these detail, and the reason they do not give, is suspicious. Share this post Link to post Share on other sites