Terencetcw 0 Report post Posted January 15, 2012 Open Kitchen "Now you see, now you don't"MBR Toilet Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 15, 2012 MBR Toilet (Cont)Water proofing doneCommon Toilet (Patch up the hole for placing shower screen) Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 15, 2012 Aircon Trunking Done (Something is not right~)These 2 pictures below doesnt seems right...the Aircon Gas Pipe? run straight across my MBR Ceiling? as the contractor told me that running big & fat trunking besides the edges will ruin the aesthetic of my design hmmm.. (placing a fore ceiling btw)Common Room 1Common Room 2Trunking running towards the storeroom and route to MBR Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 16, 2012 Guys after hacking and tiling, whats next to be done?Electrical first?False Ceiling first?or Carpentry first?Usually how long it take to put up the kitchen cabinet and other woodwork?Shoerach, TV feature wall, kitchen cabinet, MBR Wardrobe.. Share this post Link to post Share on other sites
Takeyu 0 Report post Posted January 16, 2012 Guys after hacking and tiling, whats next to be done?Electrical first?False Ceiling first?or Carpentry first?Usually how long it take to put up the kitchen cabinet and other woodwork?Shoerach, TV feature wall, kitchen cabinet, MBR Wardrobe..Eh in my opinion, i think that order of Electrical , False Ceiling then Carpentry sounds the most orderly.coz when u do electrical will have trunking, then try to use false ceiling to hide some of it, then after that rely on carpentry to cover whatever trunking can be covered.But that's just my thoughts as my reno is still much WIP ... so maybe others can help you with it. hahaha Share this post Link to post Share on other sites
Simontsh 0 Report post Posted January 16, 2012 settle electrical, aircon trunking, water and gas pipes.....go through a few rounds to make sure you have no more points to add etc. then do boxup and ceiling........above done....then ask carpenter to come in to do measurements Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 16, 2012 ok thanks folks:This is what i'm expecting:1)Aircon trunking done 2) Electrical - I have stick all my electrical point on the wall so will not miss out any 2) Tiles up3) CityGas - Water & Gas Pipe?4) False Ceiling5) Carpentry6) Touch up7) Cleaningwhere do i slot the lights installation? and LED fixing? Share this post Link to post Share on other sites
Simontsh 0 Report post Posted January 16, 2012 ok thanks folks:This is what i'm expecting:1)Aircon trunking done 2) Electrical - I have stick all my electrical point on the wall so will not miss out any 2) Tiles up3) CityGas - Water & Gas Pipe?4) False Ceiling5) Carpentry6) Touch up7) Cleaningwhere do i slot the lights installation? and LED fixing? after false ceiling up. Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 17, 2012 Thanks mate!Tomorrow i will pop down to have a look on the reno progress...is been more than 10days i didnt not view the unit Hope everything goes well without any hiccups ~ Will post more pictures by then ~ Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 18, 2012 Back from business trip again..Pop down our house and take a glace...hmm.. nothing much being done...Was expecting the tiles are all up by now~ Work Progress:Week 1: 4 days for tearing down the woodwork + wardrobe + L box...Week 2: 4 days for hacking and clear debris + Aircon truckingWeek 3: 3 days MBR and Common toilet water proofing done. Tiles partially done for MBR (Till date-18/1/12)This is consider slow? i have no idea... Here some pictures for some updates hehe More sands....Hmm aircon trunking seems running the wrong direction....i though it should be facing below the feature wall instead...This location is blowing towards the main door.... Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 18, 2012 MBR Toilet Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 18, 2012 Common Toilet Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted January 26, 2012 (edited) Hi Guys,I was thinking on which LED strips you guys are having (Cove Light)?150/m LED or 300/m?Do you guys go for Superbright SMD 5050 or 3528 is good enough? Edited January 26, 2012 by Terencetcw Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted February 5, 2012 (edited) Hihi,Things was going pretty slow in Jan12,Now the working are back and now they have the full strength on furnish up the task~ hoo Trigger Electrician,Trigger CityGASTrigger False CeilingWiring Cable are here~Cat6eMy 50Meter Speaker Cable that i purchased hehe is going to be cool~ Edited February 5, 2012 by Terencetcw Share this post Link to post Share on other sites
Terencetcw 0 Report post Posted February 5, 2012 (edited) Hacking and seal up on the connector between service balcony and Master bedroomThinking how to run the piping~Electrical to be completed by coming Monday~ (Trunking and loose wire all 50% done) Edited February 5, 2012 by Terencetcw Share this post Link to post Share on other sites