Aircon Trunking Done (Something is not right~)

These 2 pictures below doesnt seems right...the Aircon Gas Pipe? run straight across my MBR Ceiling? as the contractor told me that running big & fat trunking besides the edges will ruin the aesthetic of my design hmmm.. (placing a fore ceiling btw)

DSC04614.jpg

DSC04613.jpg

Common Room 1

DSC04619.jpg

Common Room 2

Trunking running towards the storeroom and route to MBR

DSC04618.jpg

DSC04617.jpg

 

Share this post


Link to post
Share on other sites

Guys after hacking and tiling, whats next to be done?

Electrical first?

False Ceiling first?

or Carpentry first?

Usually how long it take to put up the kitchen cabinet and other woodwork?

Shoerach, TV feature wall, kitchen cabinet, MBR Wardrobe..

 

Share this post


Link to post
Share on other sites

Guys after hacking and tiling, whats next to be done?

Electrical first?

False Ceiling first?

or Carpentry first?

Usually how long it take to put up the kitchen cabinet and other woodwork?

Shoerach, TV feature wall, kitchen cabinet, MBR Wardrobe..

Eh in my opinion, i think that order of Electrical , False Ceiling then Carpentry sounds the most orderly.

coz when u do electrical will have trunking, then try to use false ceiling to hide some of it, then after that rely on carpentry to cover whatever trunking can be covered.

But that's just my thoughts as my reno is still much WIP ... so maybe others can help you with it. hahaha

 

Share this post


Link to post
Share on other sites

settle electrical, aircon trunking, water and gas pipes.....go through a few rounds to make sure you have no more points to add etc. then do boxup and ceiling........

above done....then ask carpenter to come in to do measurements

 

Share this post


Link to post
Share on other sites

ok thanks folks:

This is what i'm expecting:

1)Aircon trunking done

2) Electrical - I have stick all my electrical point on the wall so will not miss out any :rolleyes:

2) Tiles up

3) CityGas - Water & Gas Pipe?

4) False Ceiling

5) Carpentry

6) Touch up

7) Cleaning

where do i slot the lights installation? and LED fixing? :unsure:

 

Share this post


Link to post
Share on other sites

ok thanks folks:

This is what i'm expecting:

1)Aircon trunking done

2) Electrical - I have stick all my electrical point on the wall so will not miss out any :rolleyes:

2) Tiles up

3) CityGas - Water & Gas Pipe?

4) False Ceiling

5) Carpentry

6) Touch up

7) Cleaning

where do i slot the lights installation? and LED fixing? :unsure:

after false ceiling up.

 

Share this post


Link to post
Share on other sites

Thanks mate!

Tomorrow i will pop down to have a look on the reno progress...

is been more than 10days i didnt not view the unit :D Hope everything goes well without any hiccups ~ :bow:

Will post more pictures by then ~ :yamseng:

 

Share this post


Link to post
Share on other sites

Back from business trip again..

Pop down our house and take a glace...hmm.. nothing much being done...

Was expecting the tiles are all up by now~

Work Progress:

Week 1: 4 days for tearing down the woodwork + wardrobe + L box...

Week 2: 4 days for hacking and clear debris + Aircon trucking

Week 3: 3 days MBR and Common toilet water proofing done. Tiles partially done for MBR (Till date-18/1/12)

This is consider slow? i have no idea... :unsure:

Here some pictures for some updates hehe :rolleyes:

DSC04628.jpg

DSC04629.jpg

DSC04642.jpg

More sands....

DSC04630.jpg

DSC04632.jpg

Hmm aircon trunking seems running the wrong direction....i though it should be facing below the feature wall instead...

This location is blowing towards the main door....

 

Share this post


Link to post
Share on other sites

Hi Guys,

I was thinking on which LED strips you guys are having (Cove Light)?

150/m LED or 300/m?

Do you guys go for Superbright SMD 5050 or 3528 is good enough?

:yamseng:

Edited by Terencetcw
 

Share this post


Link to post
Share on other sites

Hihi,

Things was going pretty slow in Jan12,

Now the working are back and now they have the full strength on furnish up the task~ hoo :thumbs up:

Trigger Electrician,

Trigger CityGAS

Trigger False Ceiling

Wiring Cable are here~

DSC04649.jpg

DSC04654.jpg

DSC04656.jpg

Cat6e

DSC04653.jpg

My 50Meter Speaker Cable that i purchased hehe is going to be cool~

DSC04650.jpg

Edited by Terencetcw
 

Share this post


Link to post
Share on other sites

Hacking and seal up on the connector between service balcony and Master bedroom

DSC04658.jpg

Thinking how to run the piping~

DSC04659.jpg

Electrical to be completed by coming Monday~ (Trunking and loose wire all 50% done)

DSC04660.jpg

DSC04661.jpg

Edited by Terencetcw
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×