yaolong 0 Report post Posted October 5, 2011 wow your tiling is looking good. we also went up daily and bought them drinks/or snacks for them too! the whole wall tiles must be ex!ya i believe in rewarding when good work is being done... no la, the whole wall tiles is not ex la...Your kitchen wall tiles look quite unique and does it give the 3D effect? I am still contemplating if I should get the side to side fridge..... The chiller and freezer capacity is bigger but do u think i can put a 3kg sponge cake in it? What is the Max size of cake I should order for this type of fridge? Just worry cannot go in, then how???yes i think it gives the 3D effect... 3kg sponge cake shouldn't b a problem... the shelves can b remove for bigger room...very green tiles u have there. hehehe. nice!thanks!ur kitchen wall tiles exactly like mine..but mine is white..haha.glad someone shares the same taste as my mum... albeit different colours... haha Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 5, 2011 went inspection today again... workers must b very shock why this owner so free one... wall for kitchen 95% done...any advice on those white colour stuff they used to 'seal' the gaps between the tiles... what is the white stuff known as?is there a better quality stuff that i can get them to use? i have the intention to stay at this home for a long long time so i want to have quality n long lasting things... haha... wall for study room up and door frame up Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 7, 2011 updates on the progress...Sebastian and his team doing the rewiring now...Aron's company doing the aircon trunking too... Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 7, 2011 kitchen flooring done... Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 9, 2011 Your place is really BIG. Where do you plan to install the LED strips? Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 9, 2011 Your place is really BIG. Where do you plan to install the LED strips?No $ to do lots of cove so just a tiny little cove on the ceiling separating the dining hall and the front hall. For decorative purposes. When got more $, then maybe take out the L-box to do a cove round the halls. LoL Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 10, 2011 U can consider doing a strip under the top hung kitchen cabinet to light up the kitchen top. What top are u using? Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 10, 2011 U can consider doing a strip under the top hung kitchen cabinet to light up the kitchen top. What top are u using?One question: Is the LED strip we ordered 'plug-and-play' since the UK 3pin plug is provided? Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 10, 2011 One question: Is the LED strip we ordered 'plug-and-play' since the UK 3pin plug is provided?Yes. You can either plug it directly to a 3pin socket or what I did was asking my electrician to cut and connect it to a toggle switch so that you can on it like a light switch instead of from a power socket. They will know what to do. Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 10, 2011 Yes. You can either plug it directly to a 3pin socket or what I did was asking my electrician to cut and connect it to a toggle switch so that you can on it like a light switch instead of from a power socket. They will know what to do.I was thinking how to use the LED after the reno completes, say ten months down the road. Glad can plug and play! Yeah! Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 10, 2011 went up to my new house on a boring monday... progress is good so far... kitchen cabinet case done, kitchen floor tiles donemaster toilet almost done...tomorrow they r running the plumbing... Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 10, 2011 we got Aron as recommended in renotalk to do our aircon... we went up on Sunday to see see look look coz we know the workers won't b working on Sunday...to our horror, we saw the aircon piping not connected to the trunking...immediately we sms Aron... we thought alamak he won't respond coz it is a non-working day... to our surprise, he responded promptly...we told him the problem n sent the photo to his email... he promised to check n revert on Monday after he checked with his workers...i thought i will have to remind him on Monday but no need... he replied b4 i even asked again...heng, i got him to do the aircon or else those big big shop will tell me fly kite coz i never check properly b4 i let the workers go off... Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 11, 2011 (edited) piping almost donebalcony floor tiling almost done Edited October 11, 2011 by yaolong Share this post Link to post Share on other sites
dreamygal 0 Report post Posted October 11, 2011 we will put up another tv in the kitchen for her... Nice wor... It will be SO nice if i can watch tv while i bake... Haa... By the way, can pm me your woodworks contact please?? Share this post Link to post Share on other sites
yaolong 0 Report post Posted October 13, 2011 Nice wor... It will be SO nice if i can watch tv while i bake... Haa... By the way, can pm me your woodworks contact please??PM sent Share this post Link to post Share on other sites