Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
SophiaCheng

Home @yck

Recommended Posts

Have been really busy managing work, kids and the house. By the time I started taking photos, some of the rooms were started on. Nevermind, better than nothing.

DSCN1666.jpg

The original kitchen cabinets were removed and that's all its left.

DSCN1668.jpg

The wet kitchen.

DSCN1669.jpg

View from the back of the house

DSCN1671.jpg

Common toilet at the kitchen

DSCN1674.jpg

View of living room from inside of house

Will upload more later.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

DSCN1676.jpg

My son's room on the 2nd floor

DSCN1677.jpg

DSCN1678.jpg

The attached bathroom for his room

DSCN1679.jpg

This was the master bedroom orginally. Located on the 2nd floor. We've changed it into two rooms for my girls.

DSCN1681.jpg

The orginal MBR bathroom which will be used for my girls.

 

Share this post


Link to post
Share on other sites

DSCN1682.jpg

Bathroom all hacked. Tub and tiles all removed.

DSCN1684.jpg

3rd floor: Was two rooms originally. Now going to be the MBR. The bath was two different rooms, one for WC and one for shower. Combining to one L shape bathroom instead.

DSCN1685.jpg

DSCN1686.jpg

Original 3rd floor two single rooms before change.

 

Share this post


Link to post
Share on other sites

DSCN1685.jpg

DSCN1686.jpg

Original 3rd floor single bedrooms. Change to one MBR.

DSCN1684.jpg

The toilet was originally outside and the WC and shower were separated. Now joining them together and adding walls so that the 3rd floor becomes the whole MBR.

 

Share this post


Link to post
Share on other sites

Since we were not the supertitious kind, we started work in August despite being the 'ghost month'. The more urgent issue was to get the house ready in time before I pop my no.3 in Nov. Hubbi and I co-ordinating this ourselves without ID coz we know what we want and we had contacts on the various companies since we had done this before for house no.2. I think I'm seriously crazy when I'm now into my third trimester and going around is kindof difficult. But what to do, the quotations were seriously even crazier when contractors see the address.

 

Share this post


Link to post
Share on other sites

DSCN1703.jpg

The two single rooms 'opened' for the MBR.

DSCN1700.jpg

One of the toilet opening covered and changed.

DSCN1718.jpg

The MBR taking shape.

We've used polycarbonate material to make 'walls' to my WIW and to separate the MBR. The walkway will lead to the toilet.

 

Share this post


Link to post
Share on other sites

DSCN1704.jpg

DSCN1705.jpg

The original windows on the left were not practical so decided to hack and change to sliding doors instead. Was worried the hacking would affect the marble floor but turned out ok. heng ah otherwise dun know where to get the same marble to patch back.

DSCN1706.jpg

The windows at the kitchen were original the louvers kind. Changing them to sliding as well.

 

Share this post


Link to post
Share on other sites

DSCN1707.jpg

The wet kitchen will be 'extended' to a L shape so that the space will be maximise. Will also add the tiles so that it will be easier to get rid of the oil and grease.

DSCN1669.jpg

Remember the back fence? It's now this:

DSCN1708.jpg

Brick wall built with an additional planter box for my herb garden.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×