Hi All,

I have applied permit to hacking the Store Room wall to have more space for living room and kitchen.

This is what HDB has replied:

Demolition of internal walls at (a) KITCHEN and (b) STORE ROOM marked RED on plan.

HDB answer:

- All existing reinforced concrete structures are not allowed to be tampered with in the course of the works.

The lessee shall be responsible for the proper installation, stability and safety of the proposed works.

- Demolition of sandwich polyfoam wall is allowable up to the underside of the RC structures only.

Hacking of sandwich polyfoam wall should commence from top down.

Lessee shall be responsible for any subsequent leakage or seepage which may arise due to the proposed work..

Please can you let me know how to define the store room is RC or sandwich polyfoam wall?

If we hack it wrongly, what is the consequences?

Thanks a lot for your advice. :)

Cheers

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

just see your floorplan...

solid black line cannot hack...

retangular lines can hack... but why you ask your id should know all these...

if hack wrongly the structure of the HDB will be weakened...

then you got to rebuild the wall followed by summons by hdb etc etc...

Hi All,

I have applied permit to hacking the Store Room wall to have more space for living room and kitchen.

This is what HDB has replied:

Demolition of internal walls at (a) KITCHEN and (b) STORE ROOM marked RED on plan.

HDB answer:

- All existing reinforced concrete structures are not allowed to be tampered with in the course of the works.

The lessee shall be responsible for the proper installation, stability and safety of the proposed works.

- Demolition of sandwich polyfoam wall is allowable up to the underside of the RC structures only.

Hacking of sandwich polyfoam wall should commence from top down.

Lessee shall be responsible for any subsequent leakage or seepage which may arise due to the proposed work..

Please can you let me know how to define the store room is RC or sandwich polyfoam wall?

If we hack it wrongly, what is the consequences?

Thanks a lot for your advice. :)

Cheers

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×