centrino2 0 Report post Posted October 10, 2011 (edited) Tonite met up with Jeffery from Defu Furniture wallpaper/curtain team for measurement. We purchased wallpaper for 4 walls as well as 2 bedroom blinds from them during a furniture expo show in July. Jeffery brought all the wallpapers that we have chosen earlier up to our house to finalize on the choices against our painted rooms. Thanks for carrying all the heavy wallpaper books alone Jeffery going thru the wallpaper bookmbr wallpaper dining wallpaper Edited October 10, 2011 by centrino2 Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 10, 2011 bedroom 1 notice the crystal hair bandbedroom 2 Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 11, 2011 We have decided to go with Imperial Products for the mbr vanity top and bay windows. Have anyone else use them before? Winter Snow for mbr vanity top Winter Glass for bay windows Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 (edited) It's been a month since the renovation started and the followings have happened:1) Hacking of the:old kitchen cabinetstoilet wall/floor tiles/bath tub/sinks.....2) plumbing works3) installation of shower faucets, wc, water heater tank...4) laying of tiles in the kitchen and toilets5) removal of old Daikin aircons from all bedrooms, old conceal pipings, relay new pipings, clean/wash the living/dining Daikin aircons, install new Mitsubishi inverter aircons for all bedrooms by PassionAir6) False ceiling installation7) installing of electrical wiring, switches, sockets, downlights, T5/LED in light coves in living/mbr, yard/storeroom lights by electrician BJ8) painting of the whole house9) Repairing of the laundry system by Nam Lee10) measurement and confirmation of pole system wardrobe by Home Win11) measurement and confirmation of window grilles, wrought iron main gate by Tay Boon Tat12) measurement and confirmation of blind and curtain by Mirage Blinds13) confirmation of solid surfaces for vanity and bay windows by Imperial productsAnd of course some hiccups....cracked tiles from Hafary, rusty downlight from Philips, change of mbr door due to a deep scratch........Amid all that our dream home is starting to take shape.....and can't wait for month 2 to begin Edited October 12, 2011 by centrino2 Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 Living roomDining areaKDK V56VK fan Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 KitchenKitchen wall tilecan u see the champagne glass? Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 (edited) bedroom 2mbr light covembr toilet Brushed Nickel rain shower Edited October 14, 2011 by centrino2 Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 common toiletshower screen door yet to be installedleftover tiles Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 storeroom and yard lightbedroom 1 chandelier yet to be installeddining pendant light yet to be installedPanasonic door magnet stopper Share this post Link to post Share on other sites
JX83 0 Report post Posted October 12, 2011 Hi don mind can I check with u your aircon cost u how much mitsubishi inverter system 2 + installation & wires everything? U can pm me if u don wan to disclose the amount here thanks Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 12, 2011 Hi don mind can I check with u your aircon cost u how much Mitsubishi inverter system 2 + installation & wires everything? U can pm me if u don wan to disclose the amount here thanks I have installed a Mitsubishi Electric System 3 Inverter aircon for the 3 bedrooms. Can't share the purchase price of the aircon as it was a special deal from a friend in Mitsubishi. I have engaged PassionAir to help with the overall installation for ~$1400 (concealed installation with removal of old piping and aircon). They have actually completed the installation but have yet to collect the balance of the payment as they are still waiting for the full renovation to be completed. They will only collect after they have tested the aircon installation with me at the end of the renovation. Great and very responsible company.Aircon covered after installation to ensure that subsequent renovation will not dirty it Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 14, 2011 Today the workers completed the polishing of both parquets in all bedrooms and the living/dinning marble floorings. The floors are now "shiningly ready" waiting for the carpentry to start work Polished marble flooringpolished parquetPolisherworker going thru their rounds Share this post Link to post Share on other sites
Yuki&jason 0 Report post Posted October 14, 2011 Hi, like the effect of your Cove light, can PM me the link as well. Thks ! Share this post Link to post Share on other sites
centrino2 0 Report post Posted October 14, 2011 Hi, like the effect of your Cove light, can PM me the link as well. Thks !PM liao.... Share this post Link to post Share on other sites
Yuki&jason 0 Report post Posted October 15, 2011 Thanks Alot centrino2, order place. how long did u wait for the item to received ? Share this post Link to post Share on other sites