Stanley Ng 0 Report post Posted August 21, 2011 Hi,Under the HDB general Specs:ServicesGas services and concealed water supply pipes.Concealed electrical wiring to lighting and power points (including water heater and air-conditioning points).->*Concealed electrical wiring to lighting and power points (including water heater and air-conditioning points*Meaning that all my air con piping will not be expose with those huge casing?Anyone know on this?Thanks....... Share this post Link to post Share on other sites
ben263 0 Report post Posted August 22, 2011 bro...generally all cabling and aircon must NOT be consealed within any HDB flat... (unless originally done by HDB)so yes you will see the hugh ungly casings...but you can get the false ceiling guy to do a box up so it looks more like a wall then the ugly casing. Share this post Link to post Share on other sites
Stanley Ng 0 Report post Posted August 23, 2011 Thanks Bro! That's was everyone doesn't want to see. Share this post Link to post Share on other sites
yoongf 11 Report post Posted August 23, 2011 The general specs are referring to the "electrical wiring" to the aircon compressor. Not referring to the aircon gas piping. Share this post Link to post Share on other sites