Once the Leveling of the kitchen is done, the kitchen floor tilings are done as well. The pace that they are doing , is rather amazing.

IMG_0677.jpg

cabinet base and fridge base are done as well.

Protective sheets are laid to protect the flooring.

IMG_0679.jpg

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Photos taken on Friday (12th Aug)

IMG_0681.jpg

Wiring is being done. Contractor actually met up with me to discuss the electrical points and switches.

Also decided on Aircon positions, lamination colours, paint colours , etc.

IMG_0680.jpg

 

Share this post


Link to post
Share on other sites

Amazed with on speed of ur reno. Guess tt u are pretty much on schedule :) Nonetheless, do check the floor tiles to ensure tt they are properly lay and 'solid'. Knock on them to ensure there's no hollow sound underneath.

Wat I earlier meant by floorplan is the modified layout plan based on how ur new hse is to be designed. I'm still trying to see how best i could squeeze out a storage area without 'compromising' my idea of widening the living room :unsure: Will be fondling with the idea of extending out the MBR toilet too.

 

Share this post


Link to post
Share on other sites

As of Saturday (13th Aug 2011)

2 weeks from start of renovation, things already completed :

- whole house plastering

- Walk-in wardrobe extension

- Floor tiling

- wall tiling

- both toilets

- Kitchen base for cabinet, fridge

- Wiring

- Water pipe

Understood from contractor that this coming week, by friday, all will be done, excluding the carpentry. All measurements have been taken already so 1 more week for carpentry !

IMG_0687.jpg

IMG_0685.jpg

Current state of unit

 

Share this post


Link to post
Share on other sites

Amazed with on speed of ur reno. Guess tt u are pretty much on schedule :) Nonetheless, do check the floor tiles to ensure tt they are properly lay and 'solid'. Knock on them to ensure there's no hollow sound underneath.

Wat I earlier meant by floorplan is the modified layout plan based on how ur new hse is to be designed. I'm still trying to see how best i could squeeze out a storage area without 'compromising' my idea of widening the living room :unsure: Will be fondling with the idea of extending out the MBR toilet too.

Let me do a little search on the modified floorplan :) They actually gave me some time ago, but never really took note of it...

For the MBR toilet, do take note of the approval. I did check with HDB and my contractor actually told me that at most can extend out 1 feet. Doesn't seems very cost efficient to me. Spending a few more K to extend 1 feet out.

I will be shifting in on 29th Aug, so everything has to be done FAST !!!

For the tiling, actually I'm quite impressed with their workmanship. I though that I myself have to check tile by tile, but when I am there to pay a visit, I saw the workers are actually checking tile by tile before laying the protective sheet on them.

 

Share this post


Link to post
Share on other sites

Let me do a little search on the modified floorplan :) They actually gave me some time ago, but never really took note of it...

For the MBR toilet, do take note of the approval. I did check with HDB and my contractor actually told me that at most can extend out 1 feet. Doesn't seems very cost efficient to me. Spending a few more K to extend 1 feet out.

I will be shifting in on 29th Aug, so everything has to be done FAST !!!

For the tiling, actually I'm quite impressed with their workmanship. I though that I myself have to check tile by tile, but when I am there to pay a visit, I saw the workers are actually checking tile by tile before laying the protective sheet on them.

Thks.

Tts good! Seems tt u hv managed to get a very responsible contractor for the tiling works. At times, it's all depends on luck, though we had spent considerable time researching and talking to IDs/contractors. Some are good all the way while some may be good during discussion phase but start to slack when actual works begins. Tts y alot of time is require for us to go down and look at progress frm time to time. It'll be very disturbing if rectifications are needed to be done at the 11th hrs.

 

Share this post


Link to post
Share on other sites

Very fast reno for your flat. That's really good.... i understand for the speed especially when in a rush to move in.

I used to stay around there too.... blk 6xx, opposite YCK mrt. Nice place.... miss it a lot. All the best to you!

 

Share this post


Link to post
Share on other sites

Very fast reno for your flat. That's really good.... i understand for the speed especially when in a rush to move in.

I used to stay around there too.... blk 6xx, opposite YCK mrt. Nice place.... miss it a lot. All the best to you!

Thanks :)

Yea, have to rush to get all in order. But just received some calls and apparently carpentry might take awhile. I wouldn't want to rush them since workmanship for carpentry is very important ! Yea, 6xx series. Convenient !

 

Share this post


Link to post
Share on other sites

Some updates for the day . It's Monday ( 15th Aug ) , which is the beginning of 3rd week of reno.

Headed down to unit at about 3pm and False Ceiling for MBR, walk-in wardrobe is done. Brackets for living hall is also up already, so expect to see it done by end of the day ba !

IMG_0698.jpg

MBR false ceiling ( only doing the centre portion which will run down and connects with the Featured wall.

IMG_0699.jpg

Walk-in-wardrobe. False ceiling done as well. Will be having a pocket sliding door here.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×