nobelleng 0 Report post Posted August 12, 2011 (edited) Greeting to all Fellow Renotalkers, Me (Chimp) and Wifey (Puppy) have bought our very first HDB at Anchorvale Road.Life ain't easy but this is the day we call this place home feel so great. As to mark this journey to remind us, I decide to start this t-blog and hope we enjoy the process.I will try progressively on my reno. Thanks for viewing...Floorplan Edited August 12, 2011 by nobelleng Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 12, 2011 (edited) Pre-Reno ConditionsMaster RoomMaster Room Toilet Edited August 12, 2011 by nobelleng Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 12, 2011 (edited) Common RoomLiving Room Edited August 12, 2011 by nobelleng Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 12, 2011 (edited) KitchenCommon Toilet Edited August 12, 2011 by nobelleng Share this post Link to post Share on other sites
prody 1 Report post Posted August 12, 2011 Congrats on getting ur keys.We have somewhat similar layouts, except u have a full height window in ur LR. *envy*. Looking forward to more pics. Share this post Link to post Share on other sites
pinkwhale 0 Report post Posted August 13, 2011 Congrats!!! The existing condition of the flats still seems in good condition, COV high? Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 13, 2011 Congrats!!! The existing condition of the flats still seems in good condition, COV high?Hi pinkwhale.. the cov is 25k. To me is high but to the market is average.Conditions wise is still pretty ok. I will give it 7/10 for the conditions. Just need some minor touch up I would say. Share this post Link to post Share on other sites
metalbone 0 Report post Posted August 13, 2011 We have very similar floor plan layout Even the toilet tiles looks similar to my previous owner tiles. Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 15, 2011 Went for tiles selection last saturday at Hafary Defu Lane. Took us only 2hr to decide all the tiles for my Kitchen and Toilets. The floor tiles for kitchen, living room and rooms basically untouch. I thought the tiles is still pretty ok so save bits on that.Sorry for the unclear picture. Will borrow my sis DLSR next time.My wall tiles combo for KitchenMy wall tiles combo for Common toilet and floor tileMy wall tiles combo for MBR Toilet and floor tile Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 18, 2011 (edited) Day 1 of RenoWhen down this evening to check up on the Hacking Progress. MBR Wardrobe did not hack. Going to Reuse. Seem like I need to take care of the Buddha there.MBR ToiletCommon Room 2 - Area where original wall will be erect backPassage Way to Rooms Edited August 21, 2011 by nobelleng Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 18, 2011 Day 1 Reno - contKitchen Common Toilets Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 18, 2011 Day 1 Reno - contAll switches, power point. line point and scv point replaced. MK Brand. Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 20, 2011 Day 4Purchases of Kitchen and sanitary ware @ Genova promo. Total DMG - 2.3kFor MBR - $388 (Basin+faucet+WC+ Free Bidet Spray)BasinWCFaucet Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 20, 2011 (edited) Day 4 con'tFor Common Toilet - $388 (All same as MBR Toilet except the basin)BasinFor MBR and Common ToiletsRain Shower PanelStorage HeaterPaper HolderCorner Rack Edited August 20, 2011 by nobelleng Share this post Link to post Share on other sites
nobelleng 0 Report post Posted August 20, 2011 Day 4 con'tFor KitchenSinkMixer (Sorry for the small image. Seem like left out the actual photoshoot of the mixer)Pull Out Closet with Chopping Board Holder Share this post Link to post Share on other sites