Rover 0 Report post Posted January 9, 2013 Selected downlights: Share this post Link to post Share on other sites
Rover 0 Report post Posted January 10, 2013 Carpentry started today.Kitchen cabinet & island:TV feature wall partially up:Lower portion of display cabinet: Share this post Link to post Share on other sites
Rover 0 Report post Posted January 10, 2013 Toilet vanity cabinet:Testing of lights:MBR wardrobe also in progress but too messy inside to go in for photo taking. Also noticed dat all my kitchen & sanitary wares are oredi in the house, awaiting installation. Within dis week shld be done up. Share this post Link to post Share on other sites
ejszaka 0 Report post Posted January 11, 2013 Rover, your reno is really happening very fast. I check renotalk every day just to see its progress. Share this post Link to post Share on other sites
Rover 0 Report post Posted January 11, 2013 Rover, your reno is really happening very fast. I check renotalk every day just to see its progress.Haha.. Still got few hiccups along the way lar. Hopefully nw last phase phase oredi, will be soon soon.. Share this post Link to post Share on other sites
HaiDeChen 0 Report post Posted January 11, 2013 wow, your kitchen island is really long? is the front narrow part your dining area? Share this post Link to post Share on other sites
Rover 0 Report post Posted January 11, 2013 wow, your kitchen island is really long? is the front narrow part your dining area?Yup. Dat part is my dining table (it's extended frm the kitchen island). But the narrow part u see in the pic is the skeleton of the dining table. They'll install an Indian granite top over it as the table top proper. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted January 12, 2013 Yup. Dat part is my dining table (it's extended frm the kitchen island). But the narrow part u see in the pic is the skeleton of the dining table. They'll install an Indian granite top over it as the table top proper.How long in total? Share this post Link to post Share on other sites
Rover 0 Report post Posted January 12, 2013 How long in total?Island 3m, Dining 1.5m. Share this post Link to post Share on other sites
kim76 18 Report post Posted January 12, 2013 Testing of lights:Hi, I notice there is gaps between your lights. Did u use T5 tubes? U can ask your electrician to use overlaying wire so that there will be no gap of lights.Look nicer... :yamseng: Share this post Link to post Share on other sites
May_dream1 14 Report post Posted January 12, 2013 Island 3m, Dining 1.5m.So nice.... That's really ideal length. Share this post Link to post Share on other sites
HaiDeChen 0 Report post Posted January 12, 2013 Island 3m, Dining 1.5m.nice! your cooking area is way bigger than mine. after having mine for a few days..am expecting that I will spill over prep work for cooking onto the dining side if I ever cook..hahap/s: Indian granite is quite gorgeous. Do you have to cut yours into 2 pieces? Mine was coz the full length cannot go into HDB lifts...and also impossible to make the corner of my stairwell... Share this post Link to post Share on other sites
Rover 0 Report post Posted January 12, 2013 nice! your cooking area is way bigger than mine. after having mine for a few days..am expecting that I will spill over prep work for cooking onto the dining side if I ever cook..hahap/s: Indian granite is quite gorgeous. Do you have to cut yours into 2 pieces? Mine was coz the full length cannot go into HDB lifts...and also impossible to make the corner of my stairwell...Haha.. Datz why I always say dat space planning is impt My granite is one piece. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted January 12, 2013 Haha.. Datz why I always say dat space planning is impt My granite is one piece.say is easy, to get it done its not. mine is 10ft with 5ft for dining and 5ft for storage. I also find its a bit too small but then cannot make it any bigger or else no space to walk. Share this post Link to post Share on other sites
Rover 0 Report post Posted January 12, 2013 (edited) Main door and gate:Hood & sink installed:* awaiting solid top for kitchen, granite top for dining & cooker hob to be installed on Mon. Edited January 12, 2013 by Rover Share this post Link to post Share on other sites