May_dream1 14 Report post Posted December 16, 2012 haha....want to see reno can..but i doubt my place can play mahjong...after measuring everything...i doubt there is a place for a mahjong table and 4 chairs...lol..Oh, I thought your place was renovated to have enough place for mahjong table too? Share this post Link to post Share on other sites
HaiDeChen 0 Report post Posted December 17, 2012 supposed to have room...but last minute parents want me to shift my old piano over to my place...totally spoil everything. so now my piano HAS to go into my inner living room. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted December 17, 2012 supposed to have room...but last minute parents want me to shift my old piano over to my place...totally spoil everything. so now my piano HAS to go into my inner living room. Sell the piano away or give it away if you don't play with it anymore. Share this post Link to post Share on other sites
Rover 0 Report post Posted December 17, 2012 (edited) Living room floor tiles & kitchen wall tilings done. MBR in progress. Kitchen flooring yet to do. Edited December 20, 2012 by Rover Share this post Link to post Share on other sites
Yasuo123 0 Report post Posted December 19, 2012 Hi can u pm me ur quotation n contractor details? Thanks much!!! Share this post Link to post Share on other sites
Rover 0 Report post Posted December 20, 2012 Hi can u pm me ur quotation n contractor details? Thanks much!!!Replied. Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 Main entrance steps done:Living room skirting done:MBR flooring & skirting done: Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 Toilet done:Toilet drainage (gradient slope so dat water can flow smoothly at shower area):Rubbish chute done:Starting work on kitchen island base & washing machine base:* all electrical & water pipings for kitchen area done & concealed. Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 Plastering starting today. Next week will commence all electrical wirings & power points installation. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted December 21, 2012 quite fast!! Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 quite fast!!Yup. So far ID hv been keeping to the schedule of 8 weeks Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 (edited) Ordered items:Panasonic 55" HD LED 3D Smart TV(Got it at Megatex @ $2,598 instead, wif the same freebies + additional $100 CHOICE vouchers)LG Washer/Dryer(Got it at Megatex @ $1,089 wif $100 CHOICE vouchers) Edited December 21, 2012 by Rover Share this post Link to post Share on other sites
Rover 0 Report post Posted December 21, 2012 Will be getting this sofa over the weekend:King Koil Cassandra L-shape sofaPersonal preference is to hv the base fabric as black. Still contemplating on wat colours shld the cushions be, and whether wanna hv design on them anot. The one depicted in the above pic too 'girl girl' (flowery).Any suggestion? Share this post Link to post Share on other sites