demioboy78 0 Report post Posted July 27, 2011 I'm getting my keys soon... but have yet to locate an ID firm for my Reno.My new place is a resale 5 rm @ sengkang. As I am moving from my current place to this new place, I have very fixed time line for this reno, perhaps 5 weeks max... Just wondering if Reno work with all these are possible?- hacking and re-tiling of Kitchen + 2 bathrooms- Existing marble flooring in Living and bed rooms, just require polishing.- Electrician for whole house- Carpentry works for whole house (feature wall(s) + 2 wardrobes + TV console + kitchen cabinets)- Painting of whole house Share this post Link to post Share on other sites
Mansond 0 Report post Posted July 29, 2011 I'm getting my keys soon... but have yet to locate an ID firm for my Reno.My new place is a resale 5 rm @ sengkang. As I am moving from my current place to this new place, I have very fixed time line for this reno, perhaps 5 weeks max... Just wondering if Reno work with all these are possible?- hacking and re-tiling of Kitchen + 2 bathrooms- Existing marble flooring in Living and bed rooms, just require polishing.- Electrician for whole house- Carpentry works for whole house (feature wall(s) + 2 wardrobes + TV console + kitchen cabinets)- Painting of whole houseYeah should be possible if you engage the right ID for the work.... Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted July 30, 2011 I'm getting my keys soon... but have yet to locate an ID firm for my Reno.My new place is a resale 5 rm @ sengkang. As I am moving from my current place to this new place, I have very fixed time line for this reno, perhaps 5 weeks max... Just wondering if Reno work with all these are possible?- hacking and re-tiling of Kitchen + 2 bathrooms- Existing marble flooring in Living and bed rooms, just require polishing.- Electrician for whole house- Carpentry works for whole house (feature wall(s) + 2 wardrobes + TV console + kitchen cabinets)- Painting of whole houseEverything is possible, except your kitchen top (solid surface, granite top etc) are expected to have delay. Share this post Link to post Share on other sites
ibelieveindevil 0 Report post Posted July 30, 2011 well, if u dont custom made ur kitchn, it should be fine. Share this post Link to post Share on other sites
DampireDesign 0 Report post Posted July 30, 2011 it can be done as long as pre-planning is done to the dot Share this post Link to post Share on other sites
antimony 0 Report post Posted August 6, 2011 I'm getting my keys soon... but have yet to locate an ID firm for my Reno.My new place is a resale 5 rm @ sengkang. As I am moving from my current place to this new place, I have very fixed time line for this reno, perhaps 5 weeks max... Just wondering if Reno work with all these are possible?- hacking and re-tiling of Kitchen + 2 bathrooms- Existing marble flooring in Living and bed rooms, just require polishing.- Electrician for whole house- Carpentry works for whole house (feature wall(s) + 2 wardrobes + TV console + kitchen cabinets)- Painting of whole houseJust wondering. why 5 wweks? I am given 4 months to handover the keys of my OLD flat upon receipt the keys of my NEW flat. Share this post Link to post Share on other sites
Michael Chang 1 Report post Posted August 10, 2011 Always take a week to rectify any short comings/delays, it can be done in 4 weeks if they have the man power to work 5 days a week.Some reno company share worker/sub-out their work and this will cause delays.I've seen a double storey massionet with extensive reno incl floor job completed in less than 4 weeks (off peak) Share this post Link to post Share on other sites
dtgarden 0 Report post Posted August 11, 2011 (edited) 5 weeks should be long enough. I am doing similar stuff and my ID told me 4 weeks surely can finish.what I do1)kitchen, hacking, installing glass, cabinets, hacking floor and wall tile and relay them2)false ceiling for both living and masterbedder3)varnishing all floors4)painting5)making 2 wardrobes including one walk-in type6)electric works and curtains, wall papers etc etc..7)2 TV features walls8)one full height bookshelf and study tables Edited August 11, 2011 by dtgarden Share this post Link to post Share on other sites