Wen Wen 1 Report post Posted August 1, 2011 (edited) Another view..Dont know what is this called, but they use this plastic thingy to do the cover edge for the bathroom walls..1/2 Black tiles inside the bathroom & 1/2 white tiles outside to match the white theme for kitchen floor and walls.. Edited August 1, 2011 by Wen Wen Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 1, 2011 Hack the floor to lay the water pipe for shower area and vanity to flow into the drainage.Bathroom 50% done up.Waiting for shampoo holder. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 1, 2011 (edited) Dust bin seal up.. Edited August 1, 2011 by Wen Wen Share this post Link to post Share on other sites
pinkwhale 0 Report post Posted August 2, 2011 Looking good! Will follow this blog as I'm very keen with engaging Alan as well Share this post Link to post Share on other sites
stardust205 0 Report post Posted August 2, 2011 I got the beam in my kitchen too.. but mine is only 1.All the best for your reno! KitchenYou also notice there is 3 UGLY !! Beam in the kitchen ceiling haz Share this post Link to post Share on other sites
zer0sg 0 Report post Posted August 4, 2011 @Rondy about $28k to $30k with re-wiring included.Hi Wen Wen ! Is your a 3I unit ? i just bought one and wanted to do the same design as yours! can you recommedn your Id? Alan issit? can pm me his number? How did you manage to get approval for this ~ nice pictures btw. Share this post Link to post Share on other sites
potatoes 0 Report post Posted August 4, 2011 Wen Wen, your tiling works for living looks good... Neat and looks spacious! Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 5, 2011 @ pinkwhale thank you for reading yep Alan is what i decide to go with after meeting so many others as his workers are mostly very experience workers.@ Potatoes thank you, it look spacious now maybe it is empty @ zer0sg thanks i will PM you.@ stardust205 sadly i got 4 beams thx for HDB design ... Haz.. So many beam till i got problem thinking HOW to mount ceiling light... Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 5, 2011 After selecting we decided to go for this design of basin purchase at SIM.http://www.simsiangchoon.com/Nice & simple but too common.This is cute but too small. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 5, 2011 Basin mixer - Brand Paffoni from Italy.Spray gun - Brand Paffoni from Italy.1 white for the white kitchen theme and 1 black for the black bathroom theme02 pcs of Stop Cock for the water control for both Spray gun. Share this post Link to post Share on other sites
pinkwhale 0 Report post Posted August 6, 2011 Looking forward for more updates from you also pls share share ur experience with Alan. Think he too busy with his current projects.. He dun seems to have time to meet me haha.. Did u design ur own house or did Alan helped in ur designing? Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 6, 2011 @ Pinkwhale he design it you can pm me your contact number and i ask him to ring you? Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 6, 2011 Reno Talk forum by far have better any new owner BEST friend for all the information and knowledge and do & dont ...A big thanks to everyone have for all their posting and sharing ... Thank you.I hope i can contribute some..Most of the time workers when they hack, apply cement on tiles etc will have alot of bits & pieces of everything on your flooring. Those lazy workers before hand-over to you will need to wash the place up. So what they do??Wash everything into your drain which may cause a chock later down the months and a BIG headache for you..As all the tiling have almost been done, thus !! today my ID Alan told me to go down and buy plastic drainage cover and install inside all the drainage area.To prevent washing of large items down.See all those broken tiles and cement !!Cover!! Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 6, 2011 Before more work is done, ID Alan also told us to come down today to our home and test if the water will flow right into the drainage if not they will hack and re-do.Also now i know why our ID rush our to install the aircon frame and window frame even before any work begin.Because if the aircon frame is not install 1st, once they plaster the wall any removal or installation of the new aircon frame will cause the plaster to be damage.Plastering work begin today for the next 2 days. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 6, 2011 BEFORE 2 door to enter the bathroom from kitchen area.NOW 1 door to enter the bathroom from kitchen area. Share this post Link to post Share on other sites