footprint 0 Report post Posted July 29, 2011 wow.. seems you converting it into a studio apt type hor. nice nice .. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 @ hafiizh thanks so much for your comment ... The drain covers have ALOT ALOT of design and color to match your floor tiles if you buy direct from supplier ...@ footprint yep we would using the:(actual) common bedroom (change into) master bedroom as it is larger in size.(actual) master bedroom (change into) a whole room as walk in wardrobe. Already neighbors are complaining on the hacking.... Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 (edited) We are going to hack a door space to enter the bathroom from the kitchen in the middle of the 2 original door entrance.The tiler have just seal up the right & left side original door entrance.View of the seal up original door entrance from inside of the bathroom. Edited July 29, 2011 by Wen Wen Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 (edited) LEFT Wall in the kitchen area 1st Day2nd DayDone Edited July 29, 2011 by Wen Wen Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 RIGHT Wall in the kitchen areaThe tiler have more fussy than me they will hack and remove any tiles even it is dry up that is chip or not up to their standard. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 Work begin for our bathroom which would be ALL BLACK theme Laying of water proof membrane.Setting up frame work to start laying titles so it can alight right. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 29, 2011 This would be our living room - kitchen - bedroom 1 - master bedroom floor tiles. The whole house would be the same tile. The tiler can only begin work on Mon as Sat & Sun HDB dont allow any work to be carry out that will create noise. Share this post Link to post Share on other sites
Blooie 0 Report post Posted July 30, 2011 Seems like a fair bit of hacking going on there. Care to share the quotation? I just got a 3rm too and will be getting keys sometime early sept so looking around for ideas and quotes.. Thanks! Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 30, 2011 @Rondy about $28k to $30k with re-wiring included. Share this post Link to post Share on other sites
west 1 Report post Posted July 30, 2011 nice to find another lover of black theme bathroom Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted July 30, 2011 @west thank you but i am worried it maybe too dark as my bathroom floor and walls are all black tiles.Anyone can share their experience if there are any strong or safe window grills selection of materials i can get? Or by installing window locks would be safe enough?Thanks.Wen Share this post Link to post Share on other sites
Kobelala 8 Report post Posted July 30, 2011 [As my bathroom flooring would be black tiles, thus ID Alan would so smart to suggest me using this colored "Floor Trap" instead of the normal stainless steel or white plastic cover which would make my black floor tiles very ugly.Nice floortraps Congrats on ur new home, wish u a smooth n fun reno journey Share this post Link to post Share on other sites
Reiki 0 Report post Posted August 1, 2011 Interesting idea to have many walls hacked. It will definitely give lots of space. I have a friend hoping to do such thing when she gets her flat. And surely, will get her to follow your renovation here. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 1, 2011 Work began today on laying tiles for areas like living room, kitchen and both bedroom.I did not know they use this form board to elevate our floor due to weight loading given by HDB, so you cannot fill the whole floor with cement. Share this post Link to post Share on other sites
Wen Wen 1 Report post Posted August 1, 2011 Form board filled up and covered with cement.Living room almost done going into kitchen now.Common bedroom 40% done Share this post Link to post Share on other sites