hock 0 Report post Posted August 3, 2011 (edited) Reno day 26Tiling work 70% done. Only left with Mbr. Balcony tiles was ask to redo as step down was too high, and id came over to resolve. Heng ah. Yesterday met up with aircon guy, will be installing a sys 4 for the bedrooms only, So no aircon for living. This week, electrical guy coming to proceed with the work. Hope, finger cross, everything smooth smooth, no more hiccup, only left with 3 weeks to go. Balcony tiles. Close upSee the west sun shining into the living room, no aircon, must be pretty hot hot hot. Shot from balcony to living room Edited August 3, 2011 by hock Share this post Link to post Share on other sites
potatoes 0 Report post Posted August 3, 2011 Congrats, things are looking good in your renovation. 3 more weeks, all stress would be over. Share this post Link to post Share on other sites
hock 0 Report post Posted August 6, 2011 Congrats, things are looking good in your renovation. 3 more weeks, all stress would be over.hopefully, finger cross Share this post Link to post Share on other sites
hock 0 Report post Posted August 10, 2011 Reno day 33Some mistake encounter so far:1) Water tap at balcomy for my fish tank, told the contractor to drill nearer to the side of the balcony wall but end up they drill at the center, and route a horizontal pipe across.. haizzz... luckily ID resolve this pretty quick.2) washing machine water outlet install at the center, which took up the space of my WM, end up not enuf space to house the WM... currently still pending rectification. hope this could resolve fast.L box done in living room Share this post Link to post Share on other sites
hock 0 Report post Posted August 10, 2011 Cont....Partition work mostly upbedroom 2bedroom 3MBRPiping worksMBR Balcony Tiles up. This week painter coming. Color choosen. All white except for 2 bedroom. Share this post Link to post Share on other sites
hock 0 Report post Posted August 10, 2011 recently check with open net, previous owner did not sign up for the free installation which were done in early 2011. now i have to pay for the installation and waiting q is till end Nov 2011.... such a long wait and i cant hide cable trunking by then. Share this post Link to post Share on other sites
stardust205 0 Report post Posted August 10, 2011 (edited) Reno progress looking good my fren.The truncking for the optic-fibre wire is slimmer than normal electrical wires trunkings. May not turn out as bad as u tink. Edited August 10, 2011 by stardust205 Share this post Link to post Share on other sites
hock 0 Report post Posted August 10, 2011 No choice lah nw. Have to pay n showcase the trunking. Reno progress looking good my fren.The truncking for the optic-fibre wire is slimmer than normal electrical wires trunkings. May not turn out as bad as u tink. Share this post Link to post Share on other sites
hock 0 Report post Posted August 10, 2011 (edited) Some of purchase that was deliver and install. Ariston heaterEllane hood n hodIxiss rain showerLighting and toilet barang barang Edited August 10, 2011 by hock Share this post Link to post Share on other sites
hock 0 Report post Posted August 14, 2011 (edited) Went up to my unit in the evening and found the west sun so strong that it reach 3/4 of my living room. Think got to install those roller blind, black out type. Any recommendation? Edited August 14, 2011 by hock Share this post Link to post Share on other sites
hock 0 Report post Posted August 17, 2011 Reno day 41.Counting down to end of august. Went up see see look look. Carpenter was working on kitchen cabinet as promise this week. Met contractor for granite top who came over to took some measurement. Electrician also busy installing lights n except for some loose socket point outstanding.. Window grill and glass door up too. Went down to kong tai to exchange ceiling fans as I feel my unit height seem short. Exchange 2 kdk baby fan instead. No choice. Some photos update.Kitchen cabinets half way doneSink in place Living room lightings Share this post Link to post Share on other sites
hock 0 Report post Posted August 21, 2011 (edited) Yesterday went to check out the installation of bathroom accessories and meet up id. All items were installed. Only the towel rack in Mbr bathroom need to reinstall as it was too high for my wifey. Tiles need to change out after redo. Id ok with it and I feel very pai say, cause it's me who told the plumber to install at that height. Never think hard enuf. Next abit regret doing the box up of my Mbr bathroom pipes. After installation of the toilet bowl than realize my poo poo space very squeeze. No choice, have to bare with it. Can't put on any more weight, if not no room for poo poo. Few photos to update. Mbr bathroom. See the space for poo poo. Common bathroomKitchen granite stone installed. Luv the white and clean feel. That's all for today. Counting down to 6 sept that is our move in date. Next week painter and carpenter will finish up remaining work and id will be arranging for chemical wash. Edited August 21, 2011 by hock Share this post Link to post Share on other sites
potatoes 0 Report post Posted August 21, 2011 Congrats on your completion of reno. All the best on your moving in Share this post Link to post Share on other sites
veronehoo 0 Report post Posted August 22, 2011 Noticed ur toilet roll holder is right behind, isn't it inconvenient after 'doing business' must turn back couple of times? Share this post Link to post Share on other sites
veronehoo 0 Report post Posted August 22, 2011 My MBR wc is just like urs, in between boxup wall and vanity cabinet, also no space for toilet roll holder at the side of wc. In the end, we place the toilet roll holder infront of the wc, better that taking the risk of a twisted back.. Haha... Share this post Link to post Share on other sites