hock 0 Report post Posted July 9, 2011 (edited) Congrats on the start of your reno!!! HUAT AR!!!Thanks blue. Hope everything smooth smooth. After knowing that we got the same comPany, pre warn my Id first. Edited July 9, 2011 by hock Share this post Link to post Share on other sites
hock 0 Report post Posted July 9, 2011 If i am not wrong, you can still apply for a second air con system from HDB. They will approve as long as not too many other units of your block have a second system and the overall electrical load does not exceed what the main cables can take. For my case, I would really like to have more air cons, but I only found out from my ID that I could have applied to HDB for permission after the renovation process was completed.Thanks. Getting id to check it out. Have yet to revert. Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 9, 2011 Thanks blue. Hope everything smooth smooth. After knowing that we got the same comPany, pre warn my Id first.wahahahahhaa Share this post Link to post Share on other sites
hock 0 Report post Posted July 12, 2011 Reno day 5Arrival of tilesFinal day for hacking Share this post Link to post Share on other sites
hock 0 Report post Posted July 14, 2011 Any bro & sis could intro good mover. TIA. Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 14, 2011 Any bro & sis could intro good mover. TIA.I used Movers101, boss name is Albert. Share this post Link to post Share on other sites
hock 0 Report post Posted July 14, 2011 I used Movers101, boss name is Albert.Can pm me the contact. Thks thks Share this post Link to post Share on other sites
hock 0 Report post Posted July 19, 2011 Reno day 12Seem like progress is slow. At least better than Monday where Only the tiling boss ard to lay tiles. Claim workers went to wrong location. Crab. Crab. Crab. Today at least 70% of kitchen wall tiles up, study room wall erected, kitchen floor cemented. Photo update (19 July 2011)Kitchen wall tilesClose up view of kitchen wall tilesStudy room wall erected. Share this post Link to post Share on other sites
hock 0 Report post Posted July 22, 2011 Did not check progress for last 2 days. Today went see see look look. Wall tiles for toilets partially install. Also started floor tiles at foyer. Reno day 15: Common toiletCement toilet floor. Seem that the shower area drop down is shallow. Wat is the prefer height for the drop down. Foyer area Share this post Link to post Share on other sites
oks82 0 Report post Posted July 23, 2011 hey wow 154sqm, soo big! how much did you pay for the flat? any COV?looks like quite an overhaul! how much is your reno? Share this post Link to post Share on other sites
potatoes 0 Report post Posted July 24, 2011 You are making good progress I like your toilet design/layout. As for installing 2 aircon compressors for 5 rooms, I also encounter similar situation as u. Share this post Link to post Share on other sites
hock 0 Report post Posted July 24, 2011 hey wow 154sqm, soo big! how much did you pay for the flat? any COV?looks like quite an overhaul! how much is your reno?Pay 35k cov. As compare to those unit near jurong pt, some asking up to 60 k cov, Faint. Reno close to 70k. Share this post Link to post Share on other sites
hock 0 Report post Posted July 24, 2011 Thks potatoes. U manage to apply permit for your 2nd compressor. Was think to Install 1 in my Mbr balcony.You are making good progress I like your toilet design/layout. As for installing 2 aircon compressors for 5 rooms, I also encounter similar situation as u. Share this post Link to post Share on other sites
insane 0 Report post Posted July 24, 2011 gd luck to yr reno~ plenty of space! Share this post Link to post Share on other sites
hock 0 Report post Posted July 28, 2011 Have yet to call up movers for quote, cant make up my mind, need to settle this as first week sept need to move out. Some update on reno day 20windows all are install.balcony windowcommon toiletliving room tiles Share this post Link to post Share on other sites