ccube1982

Need Quote For My Existing 4"A" Flat

Recommended Posts

Hi,

If you are an ID, please drop me a quote for the following items @ ccube1982@gmail.com, thanks. I like to do up my place start either early or mid Jun.

Requirements

Professional Services

1 Space Planning & furniture Layout

2 Design Consultation

3 Furnishing Consultation

4 Perspective Drawing On Carpentry Works

5 Materials & colour Proposal

6 Project Management & Site Supervision & Audit

7 Warranty With Guaranteed After Sales Service

Demolition & Hacking Works

1 To hack away existing floor tiles & tiles skirting @ living, dining room & store room.

2 To hack away existing floor tiles & tiles skirting @ 3 bedroom.

3 To dismantle existing 3 bedroom & storeroom door frame.

4 To hack away existing floor & wall tiles @ kitchen.

5 To dismantle existing kitchen cabinet, stove & sink support

7 To hack away existing floor & wall tiles @ master & common toilet.

8 To dimantle existing toilet accessories @ master & commom toilet.

9 To dismantle door & door frame @ master & common toilet.

10 To dismantle living room & masterbed room cornices

Sub Total: $-

Mansory Work

1 Supply & lay 600mm x 600mm polished Homogenous tiles @ Living & Dining &

store room. (390 Sqft) Included:

-main door kerb finish

-tiles skirting

2 Supply & lay 600mm x 600mm polished Homogenous tiles @ 3 rooms.

(490 Sqft) Included:

-door kerb finish

-tiles skirting

3 Supply & lay 300mm x 600mm non-slip homogenous flooring @ kitchen

(140 Sqft) Included:

-Laying concealed drainage pipe for Kitchen sink.

-Laying concealed drainage pipe for washing machine.

4 Supply & lay water proofing membrane @ kitchen. (Approved by HDB)

-1st layer = laying K-11 water proofing

-2nd layer = laying water proofing 3 in 1 cement

-3rd layer = laying Non-shrink grout water proofing cement

5 Supply & lay homogenous/ceramic wall tiles up to ceiling height @ kitchen.

(180 Sqft) Included:

-make good defect area @ kitchen entrance.

6 To construct kitchen cabinet mortal base.

7 To construct fridge & washing machine cabinet base in tiles finish.

8 Supply & install flat stainless steel rubbish chute.

9 Supply & construct low wall to support L-shape kitchen cabinet, finished by:

-63mm cement block

-In tiles finish

10 Supply & lay 300mm x 300mm non-slip homogenous flooring @ both bathroom.

Included:

-toilet entarnce door kerb.

-20mm step down shower kerb finish.

-Laying concealed drainage pipe for shower area

-Laying concealed drainage pipe for wash basin

11 Supply & lay water proofing membrane @ both bathroom. (Approved by HDB)

-1st layer = laying K-11 water proofing

-2nd layer = laying water proofing 3 in 1 cement

-3rd layer = laying Non-shrink grout water proofing cement

12 Supply & lay homogenous/ceramic wall tiles up to ceiling height @ both bathroom.

(447 Sqft) Included:

-make good defect area after hacking @ bathroom entrance

13 Supply & lay homogenous tiles (non-slip) for 2 step staircase.

Sub Total: $-

Plumbing Work

1 Replacement of standard stainless steel piping. (Cold Points)

2 Installation of 2 sets toilet bowl for labour charges only.

3 Installation of 2 sets toilet basin & tap for labour charges only.

4 Installation of 2 no's instant heater for labour charges only.

5 Installation of whole house accessories for labour charges only.

6 Installation of 1 no'stainless steel kitchen sink & tap for labour charges only.

7 Supply 1 no' stainless steel kitchen sink & tap. (Optional)

8 Supply 2 no's of toilet bowl (water saver), basin & tap. (Optional)

9 Supply & change main sewerage pipe (To be approved by HDB)

10 Supply & install 1 no' wash basin in kitchen area (Optional)

Sub Total: $-

Door Works / Window Works

1 Supply & install 1 no's 3ft x 7ft solid nyatoh main door, finished by:

-main level door lock

-stainless steel door stopper

-eye viewer

-non fire-rated finish

2 Supply & instal 4 no's solid nyatoh bedroom door frame according to existing doors'

measurements

3 Supply labour to re-install 4 no's 3ft x 7ft solid nyatoh bedroom door, included new:

-door lock

-stainless steel door stopper

4 Supply & install 1 no's 3ft x 7ft wrought iron main gate, finished by:

-Non Galvanize finish

-Include lock

5 Supply & install 2 no's aluminium frame bi-fold door in powder coated & acrylic glass

finish @ both toilet.

6 Supply & install Silver aluminium sliding window in embossed glass finish @

living area. (3 or 4 way track) (46 Sqft)

7 Supply & install Silver aluminium sliding window in embossed glass finish @

bedroom 3. (3 or 4 way track) (59 Sqft)

8 Supply & install Silver aluminium casement window in embossed glass finish @

kitchen. (3 panel) (32 Sqft) (Optional)

9 Supply & install Silver aluminium casement window in embossed glass finish @

master bedroom. (2 panel) (18 Sqft) (Optional)

10 Supply & install Silver aluminium casement window in embossed glass finish @

bedroom 2. (2 panel) (18 Sqft) (Optional)

11 Supply & install Silver 48" x 24" adjustable louver window in wire glass

finish @ master & common toilet.

12 Supply & install 1 no's aluminium overhead sliding door in powder coated & acrylic glass

finish @ kitchen entrance.

13 Supply & install tempered glass shower screen @ master bedroom.

Sub Total: $-

Misc. Work

1 To paints whole unit wall & ceiling using Nippon all-in 1 paints. (Unlimited Colour)

Included:

-main door frame = sand & re-vanish or paint glossy paints

-all door = sand & re-vanish or paint glossy paints

-all door frame = sand & re-vanish or paint glossy paints

-whole house severage UPVC pipe = paints gloosy paints

-To touch/plaster up where necessary whole unit wall & ceiling defect area.

2 To lay protection sheet @ living room & all bedroom.

3 Chemical wash & general wash for whole house. (move in condition)

4 Uplifting sand & material & debris fees.

5 HDB permit handling

Sub Total: $-

Carpentry Work

1 Designed & fabricate kitchen cabinet C/W drawer, cultery tray, in laminate &

ABS trimming & soft closing system finish by:

-Top Unit (12ft)

-Bottom Unit (15ft)

-Solid surface worktop. (15ft)

-Stainless steel disk rack

-1 panel frosted glass with aluminium frame

-1ft box up piping tall unit

2 Supply & install 1 x hob unit

3 Supply & construct wardrobes @ 3 rooms. (Optional)

4 Supply & construct shoe cabinent. (Optional)

5 Supply & construct TV console. (Optional)

Sub Total: $-

Electrical Work

1 Supply & install new DB switch board (12 way)

2 Rewiring of whole house (Optional)

3 Run 2 x light point & reinstate the existing 8 light point

4 Reinstate 9 lights.

5 Run 3 x SCV points

6 To reinstate 2 tel point

7 To install 15 double points

8 Supply & install Inverter Aircon for 4 rooms with power points & piping works. (Optional)

Sub Total: $-

Other Work

1 Supply & construct false ceiling for bedroom passage way.

2 Supply & construct L-box for living room & 3 rooms.

3 Supply & construct L- shape rack in store (4 levels).

Sub Total: $-

Total Amount Quoted: $-

Less Discount:

Total Amount: $-

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×