Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
wei2

May Our Dream Home Come True

Recommended Posts

Hi All,

I have been lurking around renotalk since Nov 2010.

Finally, my turn has come to set up a t-blog here.

Mine is a repurchased flat directly from HDB from their Sales of Balance flat exercise.

Ironically, the biggest purchase of our life is like a gamble.

We bought the flat without being able to touch it nor see it.

There's no show room or model as it is an old flat.

We can only rely on the poor resolution pictures found on HDB website to decide.

1st HDB Appointment (Flat Selection): 17 Dec 2010

2nd HDB Appointment (Keys Collection): 28 Mar 2011

4 Room Apartment

Type 3(H)

Floor Area: 101m sq

Location: Hougang St 92

Floorplan

Floorplan-600.jpg

Nevertheless, we were quite pleased with the condition of the flat when we first stepped in.

Next post, will post up pictures of the current flat.

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Congrats!!! Now easy to get to buy from balance of flats! You are so lucky!!!

The floor plan looks great! All rectangular, easy to play Reno with.

Show more pic, please!

 

Share this post


Link to post
Share on other sites

Congrats!!! Now easy to get to buy from balance of flats! You are so lucky!!!

The floor plan looks great! All rectangular, easy to play Reno with.

Show more pic, please!

Hi May_dream1, thanks for visiting.

I have been reading your t-blog all this while, envious of your big apartment and great location.

 

Share this post


Link to post
Share on other sites

As stated earlier on, we were quite pleased with the condition of the flat.

The unit has been vacant for 2 years.

HDB removed all fixtures and did a repaint before they hand the keys to us.

However, we do not understand why the previous owner choosed this kind of uneven tiles for the living room.

It is very rough and traps dirt easily.

View of our main door from the living room.

View-of-main-door.jpg

Notice the stoney pathway the previous owner delibrately built, rough texture :(

Together with the uneven grey floor tiles, it looks like the ground floor (waiting area for lifts) at my parents' flat!

View of living room from the kitchen.

View-of-Living-from-Kitchen.jpg

Another view of living room.

View-of-Living-Room.jpg

View of MBR.

View-of-Master-Bedroom.jpg

This room will be used as a wardrobe and makeup room instead of being the master bedroom.

View of bedroom 2.

View-of-Bedroom-2.jpg

This will be the study/working room.

 

Share this post


Link to post
Share on other sites

View of bedroom 3.

View-of-Bedroom-3.jpg

We will be sleeping in this room.

View of kitchen from service yard.

View-of-Kitchen-from-Bal.jpg

View of service yard from kitchen.

View-of-Bal-from-Kitchen.jpg

Will remove the curb at service yard to make it into a long kitchen as the space i have is quite narrow.

View of MBR toilet.

View-1-of-Master-Toilet.jpgView-2-of-Master-Toilet.jpg

Notice where the shower kerb lines in-between the window, that is where i'm suppose to put a shower screen. Headache.

 

Share this post


Link to post
Share on other sites

View of common toilet.

View-of-Common-Toilet.jpg

Notice how the fat ugly pipe is blocking my toilet window. Another headache.

All floor tiles, have to go.

Hack and re-tile for the whole house is a lot of money :(

If you looked closely at my walls and ceilings, you will notice grooves lines. I didn't like it.

There goes my money. $1500 for plastering the whole flat to smoothen the walls & ceilings.

Next, i will post up about the contractors that we have met up with.

6 of them.

 

Share this post


Link to post
Share on other sites

Hi May_dream1, thanks for visiting.

I have been reading your t-blog all this while, envious of your big apartment and great location.

No need to envy!! Yours are equally big too. It's nice condition from all the pictures and definitely great to have both rooms as 1. Think your wardrobe will be big too.

 

Share this post


Link to post
Share on other sites

Met up with a total of 6 contractors within a month.

By then, we were already exhausted and tired out.

We are on a really tight budget, so it wasn't easy to find someone who can work within our budget.

All the contractors we met up were recommended by our friends.

1. Kenny - ID Form

2. Ryan - Interior File

3. Ah Hwa - ID Inspiration

4. Donn - PL206 Studio

5. James - CT Square Interior Design

6. Ben - Summit Design Studio

It took us 7 weeks after getting our keys to finally confirm our contractor.

I know we were slow, but i need to be as cautious as possible.

The quotes we received, ranged from 35k to 45k.

After removing a handful of items, we managed to reduce the quote into a comfortable range for us.

I do not have a specific theme for the house.

All i want is simple, neat and clean-cut design.

Nothing fanciful or exaggerating.

My husband and i feel that Ah Hwa is the right person to work with.

Easy to talk to, experienced, not calculative and most importantly, we feel that he is reliable.

Unlike one of the contractors, who turned up 45 min late for our appointment,

and another contractor took 3 weeks to send us the quotation when he promised he need 3 days only.

And there's another contractor, we can tell that he is very experienced, but he seems to be too hard-selling.

Contractors should listen to what owners want and advise, not reject our ideas just because nobody have done it before.

Ah Hwa from ID Inspiration (subsidiary of Chng Poh Guan) not much discussed on renotalk.

Hope that there will not be too much hiccups.

Day 1 of reno, hacking will commence tomorrow!

Maybe i will post up some details about my quotation later.

 

Share this post


Link to post
Share on other sites

Unlike one of the contractors, who turned up 45 min late for our appointment,

and another contractor took 3 weeks to send us the quotation when he promised he need 3 days only.

And there's another contractor, we can tell that he is very experienced, but he seems to be too hard-selling.

Contractors should listen to what owners want and advise, not reject our ideas just because nobody have done it before.

welcome to t-blog, you have a bigger size 4room, it is in great condition and really lucky to get one of these sales of balance flats :good:

talking about these contractors, i had one who turned up 3 hours late and only after i msged him to check if he was even coming, didnt even have the courtesy to let me know he was running late, plus he never did come back to me with my quote which i didnt bother chasing for since he's clearly not interested in my small biz. :bleah:

 

Share this post


Link to post
Share on other sites

Hi All,

I have been lurking around renotalk since Nov 2010.

Finally, my turn has come to set up a t-blog here.

Mine is a repurchased flat directly from HDB from their Sales of Balance flat exercise.

Ironically, the biggest purchase of our life is like a gamble.

We bought the flat without being able to touch it nor see it.

There's no show room or model as it is an old flat.

We can only rely on the poor resolution pictures found on HDB website to decide.

1st HDB Appointment (Flat Selection): 17 Dec 2010

2nd HDB Appointment (Keys Collection): 28 Mar 2011

4 Room Apartment

Type 3(H)

Floor Area: 101m sq

Location: Hougang St 92

Floorplan

Floorplan-600.jpg

Nevertheless, we were quite pleased with the condition of the flat when we first stepped in.

Next post, will post up pictures of the current flat.

Hi..welcome to RT :yamseng:

My flat also directly from HDB Sales of Balance flat exercise too

 

Share this post


Link to post
Share on other sites

welcome to t-blog, you have a bigger size 4room, it is in great condition and really lucky to get one of these sales of balance flats :good:

talking about these contractors, i had one who turned up 3 hours late and only after i msged him to check if he was even coming, didnt even have the courtesy to let me know he was running late, plus he never did come back to me with my quote which i didnt bother chasing for since he's clearly not interested in my small biz. :bleah:

i also feel that the contractor who only sent me quotation 3 weeks later because he is not interested to take up my project.

in a way good for me also, makes the elimination process faster. no need to do a re-quote with him.

 

Share this post


Link to post
Share on other sites

Hi..welcome to RT :yamseng:

My flat also directly from HDB Sales of Balance flat exercise too

Thanks for popping into my t-blog :)

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×