Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
laion

3 Room Bukit Batok By Homesuccess

Recommended Posts

Plastering done, finally the coarse walls are gone!

Main water inlet from outside

img20110607072654.jpg

Modern looking now for a 20+ old flat

img20110607072727.jpg

img20110607073259.jpg

img20110607073243.jpg

The compressor will be installed here soon

img20110607073317.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

9/June, false ceiling in progress

Living room's up

20110609072348.jpg

2 feet false ceiling after the annoying beam to glass wall partition

20110609072451.jpg

20110609072554.jpg

20110609072942.jpg

This is the special kitchen false ceiling I was talking about, Derrick designed it to be triangular and the down lights will be shining down at some angles

20110609072932.jpg

Edited by laion
 

Share this post


Link to post
Share on other sites

Trunking for air conditioners laid, unit installation will be done another day, after painting

20110609073124.jpg

20110609073140.jpg

Master bedroom's placement

20110609073152.jpg

Guest bedroom's placement

20110609073222.jpg

Living room's placement, all trunking is done inside guest bedroom and channeled to outside wall. Happy that no trunking will be seen in living room as proposed by Derrick

20110609073312.jpg

Edited by laion
 

Share this post


Link to post
Share on other sites

Trunking from master bedroom to guest bedroom

20110609073201.jpg

Electric cables laid not as satisfactory, to feed back to Jackson

20110609073256.jpg

20110609073015.jpg

Master bedroom's feature wall in progress

20110609073423.jpg

20110609073440.jpg

 

Share this post


Link to post
Share on other sites

Kitchen false ceiling where 3 angled down lights will be installed

20110610071536.jpg

20110610071727.jpg

Ugly pipe boxed up finally, although I preferred the pipe to be relaid, but I gave in anyway. This space is meant for clothes hanging rails. Hopefully there will be no issue later

20110610071631.jpg

20110610071702.jpg

20110610071714.jpg

 

Share this post


Link to post
Share on other sites

Boxed false ceiling in master bedroom

20110610072149.jpg

Feature wall console installed

20110610071939.jpg

Noticed that this is an extension from plaster board on false ceiling, nice rounded edge

20110610071957.jpg

20110610072026.jpg

Ugly wooden board concealed

20110610072126.jpg

 

Share this post


Link to post
Share on other sites

Hi Laion,

Any more picture to share?

Looks like your house renovation is going to end soon.

Keen to know your electrician performance too as I am thinking of engaging him.

Thanks.

 

Share this post


Link to post
Share on other sites

Hi Laion,

Any more picture to share?

Looks like your house renovation is going to end soon.

Keen to know your electrician performance too as I am thinking of engaging him.

Thanks.

Yes bro, more pics taken but I was really busy to upload them! So far I would say he is OK, but the down lights work has yet started and that will be the real test.

13/June, cleaned and really for painting

20110613072119.jpg

20110613072213.jpg

20110613072242.jpg

20110613072304.jpg

Master toilet again, the gain city guys made an ugly hole for water pipe coming from the compressor. Going to make them pay when they bring in the units.

20110613072618.jpg

 

Share this post


Link to post
Share on other sites

17/June, painting done

20110617072041.jpg

I was puzzled that they did not lay the kitchen wall tiles fully, Derrick explained that cabinet will need to be installed directly onto the concrete which is more stable.

20110617072008.jpg

I really like the idea of having this concealer for the glass wall hinges

20110617072210.jpg

Toilet pipes painted

20110617073054.jpg

20110617072333.jpg

 

Share this post


Link to post
Share on other sites

28/June, tile cracks rectified

To be fair, the tiles broken during windows and air-con installation (both external contractors) were actually replaced without additional cost by Derrick. Happiness.

img20110628072920.jpg

img20110628072933.jpg

img20110628072951.jpg

img20110628073351.jpg

 

Share this post


Link to post
Share on other sites

Doors were installed too! Waiting to be painted with a transparent coating, pardon me, no idea what it is called

img20110628072527.jpg

Nice locks, Derrick passed me the keys today

img20110628072545.jpg

The color should darken once coating is painted

img20110628072704.jpg

img20110628072733.jpg

img20110628072801.jpg

 

Share this post


Link to post
Share on other sites

29/June, toiletries installed. All these stuff we bought from Wasser Bath at Balestier, together with Turbo hood, chimney, oven plus kitchen wares, costs $3.2k! We were introduced by Derrick to this shop, and Andy attended us with patience. Initial quote was very high, $3.6+ and got discounted later. Common sales tactic

Heater was on promotion at $170, there will be a glass partition of less than 2 feet length before the ugly pipe

img20110629073004.jpg

img20110629073310.jpg

Low profile toilet bowl

img20110629073016.jpg

Gonna be cramp in this small toilet

img20110629073106.jpg

My favorite of the day, no PVC!

img20110629073133.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×