Renovation in progress ~ Week 2

False ceiling for cove + down lights at the TV area

IMG_0181.jpg

Cables for two rear speakers

IMG_0182.jpg

False ceiling for cove + down lights @dining area

IMG_0179.jpg

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

I sourced for moving companies last month and one of them is The Helping Hand.

After talking to Richard on the phone, a site assessment was conducted on the 25 June 11 by Ah Boon with a quotation of a 15 footer lorry, one-way trip at $200+$25 for one floor without lift. I confirmed on the spot for the moving details and 10 free boxes were given. He did not give me his mobile no. and ask me to contact Mr Richard if there's anything.

Yesterday when I called Mr Richard, he doesn't seem to have my confirmation and said that since Ah Boon confirmed, that means it's confirmed :huh: . BUT, can we check with Ah Boon? So, he asked me to send a SMS with the details so that he can check. Till now, he did not get back to me. Now I'm feeling abit worried that I won't be able to move on 30 July 11! AND that is the day before the 7th lunar month aka ghost month :help:

 

Share this post


Link to post
Share on other sites

All the old switches in the house will have to go.

100_0934.jpg100_0937.jpg

Will be going to Choo Chiang to buy clipsal switches including 1-gang, 2-gangs, 3-gangs, water heater, single & double sockets and then getting contractor to install change at $10 each. It is still 50% cheaper than asking contractor to buy and fix. Afterall, they are also getting supplies from Choo Chiang :P

I will be buying the Schneider brand (according to the uncle, Schneider has taken over the Clipsal brand) which is the cheapest. 1-gang costs only $1.30 each.

Update on 26/7/11 - Bought all the switches, sockets & telephone outlets from Choo Chiang for a total of $65.00. I also managed to get a cheaper quote to change all the switches & sockets for a package price of $120 for the entire house ~ Thanks to Uncle Ronnie.

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

hi,

i just bought my new unit at 64X, just a street across the MRT track. =P

had a hard time seaching for contractor / ID too.. can you pm me details for your? =)

we are also a DIE hard fans of Kang Tai... since my parents time till now...i moved 2 houses...still goes back to find them...cheers!

 

Share this post


Link to post
Share on other sites

hi,

i just bought my new unit at 64X, just a street across the MRT track. =P

had a hard time seaching for contractor / ID too.. can you pm me details for your? =)

we are also a DIE hard fans of Kang Tai... since my parents time till now...i moved 2 houses...still goes back to find them...cheers!

I will hold back my contractor's contacts until end of this week that's suppose to be the house h/over. So far, comments about workmanship, project coordination and overall experience are also reserved.

Still keeping fingers crossed for our moving on this Saturday. Getting anxious cos' there is totally no progress during the 3rd week except for installing of veneer doors and re-vanish of living room & MBR parquet floorings. :o

Pending tasks for the 4th week ie. last week include fitting of WC + basin + toilet accessories, lightings, all carpentry works, shower screeens, toilet doors, mirror @dining area and acid wash + cleaning.

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 3

Painting done ~ Living TV area. The colour looks more bluish grey although I chose the pure grey colour.

Wonder why the centre is not painted? Likewise for almost the rest of walls where feature walls and cabinets are to be mounted.

I asked the contractor and he said b'cos we chose the more expensive paint ("Nippon" & "ICI" ??) and also since feature walls and cabinets will just cover up :rolleyes:??!!!

IMG_0204.jpg

~ DS's room

IMG_0203-1.jpg

~ MBR

IMG_0202-1.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 3

Paint job abit blotchy, anyway contractor said there will be a last coat done during the last week. Let's wait and see.

IMG_0201.jpg

Hacking hole to be patched up

IMG_0200.jpg

Veneer door latch hole too big - needs to be patched up too

IMG_0197-1.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

I will hold back my contractor's contacts until end of this week that's suppose to be the house h/over. So far, comments about workmanship, project coordination and overall experience are also reserved.

Still keeping fingers crossed for our moving on this Saturday. Getting anxious cos' there is totally no progress during the 3rd week except for installing of veneer doors and re-vanish of living room & MBR parquet floorings. :o

Pending tasks for the 4th week ie. last week include fitting of WC + basin + toilet accessories, lightings, all carpentry works, shower screeens, toilet doors, mirror @dining area and acid wash + cleaning.

yo really excited to see the whole things coming to an end soon. =) *crossed fingers for you*

hopefully everything turns out smooth & great for you...~

 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 4

At last renovation is "taking-shape"

Shoe cabinet cum settee at door entrance

100_0985.jpg

Feature wall adjoining the shoe cabinet ~ living room (the other side of the wall is reserved for full height mirror)

100_0947.jpg

Bomb shelter hidden behind the feature wall

100_0954.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 4

LED crystal hanging light at dining area (the only item that DS chose and it turned out to be a good choice ~ really swee :sport-smiley-018: )

100_0978.jpg

MBR entrance hanging light

100_0979.jpg

Closer look...

100_0980.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 4

Living room ~ TV area feature wall cum console drawer

100_0949.jpg

Built-in shelves at one side of the feature wall for DVDs/ display

100_0951.jpg

48 inch crestar fan

100_0950.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Renovation in progress ~ Week 4

My "M1" Kitchen is still in the making :notti:

(glass backing and granite top will be delivered later)

100_0960.jpg

Built-in oven

100_0959.jpg

Common bathroom ~ rainshower

100_0958.jpg

Edited by veronehoo
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×